Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mall of America (MOA) Request for Proposals

Similar presentations


Presentation on theme: "Mall of America (MOA) Request for Proposals"— Presentation transcript:

1 Mall of America (MOA) Request for Proposals
The Mall of America in Minneapolis, MN has designated an area of mall space to construct an indoor mini-golf course. Mall of America executives have placed a call for design concepts from the leading design firms across the United States. Your design team will be one of several teams who will pitch a design concept to MOA execs. The winning concept will receive the contract to design and build a state of the art mini-golf course in the MOA.

2 Learning Objectives Be able to work in an environment that includes remote team members. Be able to use the Engineering Design Cycle to develop a high quality proposal for a client. Be able to use Inventor 2015 to create part files and working drawings supporting your proposal. Be able to present your proposal

3 Design Statement: Competing design teams will submit a concept design containing 5 mini-golf holes illustrating the team’s overall idea for a mini-golf theme that will attract mall patrons.

4 Constraints: All holes within a group/zone must have a consistent theme. The concept design cannot exceed 25’ x 20’. Create your hole on a 25’ by 20’ by 1’ base. You will work in pairs on each hole. Most will be working with a partner from Pendleton HS. Holes can be elevated up to 5’, but appropriate safety precautions must be taken. All components of the hole must be less than 5’ tall. Pathways as needed to move from hole to hole must be a minimum of 36” wide. Holes can have some moving or animated parts. (optional) All holes will have a standard tee off pad and scoring podium (these parts will provided by the project manager). All 3D modeling should be done to FULL SCALE. Be mindful of scale and units!

5 Team Role: Design Engineer (DE):
Each design engineer pairs will provide: Preliminary brainstorm sketches describing the layout of the 5 hole course/zone. This preliminary sketch should include: the pattern of play where the players will enter and exit each area 3D model assembly of a themed hole including: moving or animated parts tee-off pad and scoring podium (provided by the PM). walking paths providing access to the hole (must be a minimum of 36” wide)

6 Team Role: Project Manager (PM):
The project manager is responsible for: assigning teams of 2 (from different sites if possible) provide a team layout diagram, assigning teams space the design of a scoring podium the design of a tee off pad the design of 150 sq. foot equipment/retail office one final team layout as an assembly drawing showing: each hole designed by the team a pattern of play outlining where players will enter and exit each area assigning a team member(s) to put together the final presentation

7 Suggestions for New Themes and Examples
Sports Logos and teams Olympic Sports Professional Sports Sports equipment Arenas and fields Fans Games and Toys Board games (Monopoly, Candyland, etc.) Legos, Blocks or building sets Card games Video games (Super-Mario etc.) Checkers, chess Holidays and Celebrations 4th of July Halloween Thanksgiving St. Patrick’s Day New Year’s Eve Birthdays Christmas Hannukah

8 Selling Your Proposal Upon completion of your proposal your team will present it to the class. The class will vote on which proposal to send on to Mall of America.

9 What is Turned in by Individuals: A PowerPoint with the following
Team members (5/23) Project Name (5/23) Team Norm Summary (5/25) Specifications and Constraints(5/25) Concepts (5/23-5/27) Concept Sketches: At least three solutions per member Develop a Solution (5/27) Decision Matrix used to select the design direction (All team members will have the same matrix) Construct and Test a Prototype (6/1-6/3) Inventor Part Files Inventor Dimensioned Drawing files Delegate who will do what on your team. Create a CAD model and complete set of working drawings for your solutions. Put screen captures in the PowerPoint. Assembly (6/3) (Animation EC) Show how all of the parts fit together and interchangeability of enhancements as appropriate. Screen capture What is Turned in by Individuals: A PowerPoint with the following

10 What will be turned in by the team
Create a Trifold Brochure Team PowerPoint Presentation marketing your solution Team Presentation (6/8) (This will be the final for Seniors)

11 How can you work in teams?
Developing team norms.

12 “The way our team will do things.”
Developing Team Norms “The way our team will do things.”

13 Learning Objectives To understand and be able to develop team norms for… Interaction with teammates File structure and organization Communication how and when Today you will create proposals to share with the rest of your team.

14 Team Norms Team norms are a set of rules or guidelines that a team establishes to shape the interaction of team members with each other and with employees who are external to the team.  What is a worst case scenario if team norms are not established?

15 Stagnant Pond or Flowing River
Ken Blanchard, of One Minute Manager fame, said that a river without banks is a pond. Likewise, a team without relationship norms leaves itself open to potential interpersonal problems

16 Brainstorm With your teammates come up with three team norms that you think will help your team succeed. (Give some time to develop ideas) Share one of your team norms with the class.

17 Sample Norms for Interacting with your team Here are some of the norms that project teams have found helpful: Listen to what others are saying Strive to understand each other's perspectives, rather than jumping to conclusions Try to resolve problems without blaming Send an acknowledgement in response to important messages Respect "do not disturb" signs on people's cubicles When you've made a commitment you can't keep, let the other party know as soon as possible If you don't understand something, ask for clarification If you see a problem that others haven't noticed, bring it to someone's attention Treat clients' issues and concerns as valid even if you don't agree with them If you think team members have a conflicting understanding of a project issue, bring it to their attention Focus on the positive: what's working well, not on what's going wrong

18 Modifying your Proposal
Using the information you have learned from other teams and from the example put together three + proposals for team norms regarding interaction with team mates. Include these in your PowerPoint

19 Team Norms: Organizing Files
File names Folders Revisions …. Why would setting standards for these be important?

20 File Name Recommendations
The important take-away points from this article are: 1. The file-naming convention that your business uses needs to be understood by everyone in the organization. 2. File-naming conventions should help people find information quickly by scanning names or by looking for dates or other signifiers in the name. 3. Files that are "naturally-ordered" are easier to scan and sort. 4. Be consistent with naming conventions (Jill Duffy PC Mag)

21 Team Norms: Organizing Files
FIRST, A NOTE ON NAMING… As different software uses different processes for naming and organizing, it’s best to avoid using things like special characters, symbols, and spaces in your naming. Things to avoid include stuff like: and ? Here are a couple of examples of good and not so good names to use: BAD: 2013 Jill+Brian GOOD: 2013_JillBrian BAD: Jill Brian Highlights GOOD: JillBrianHighlights BAD: Jills & Brian’s First Class GOOD: JillBrianFirstClass

22 Things to consider including in your file structure
A file name that establishes… Who created the file Description of the part Date created Which modification Consider a folder structure that will also help organizing information. Types of files you will be working with: Part files, Drawing files, Individual and Group Powerpoints, Brochure, … How will/can you use folders to keep your project organized?

23 With your group… Discuss file/folder structure norms for your group.
Come up with 1-3 proposals for your team Share one ideas with the class. With your group… Evan Miller Pendleton A Joshua Myers Trevor Ulicni Walker Paullus Andrew Kauffman West Dakota Story Jacob Decker Jesse Daulton Lucas Stephen Kirkpatrick Zack McDonough Austin Creger Pendleton B Jakob solomon Nick Johnson Brett McMillen West Cade Reeves Dylan Tran Isaac Parker Kevin Liam Haines Noah Wick Samuel Leader Allen Mackey Pendleton C Brady Blanscett braeden gaven sayles Andrew Burleson West Jacob Lichty Jacob S. Mahayla Taylor roxy tahmaseb Sage Barnes Tyson

24 Team Norms: Communication
With your team come up with suggestions for… How often to communicate with your virtual team. What method you will propose using for communicating. ( , shared drive, …) How will you handle if a team member is not contributing. As a team, create a proposal for your Communication Team Norm

25 What is Turned in by Individuals: A PowerPoint with the following
Team members/Schools (Monday5/23) Project Name (Monday 5/23) Team Norm Summary (Wednesday 5/25) Interaction: File/Folder Naming Standards Define the problem (Wednesday 5/25) Use the design brief to generate Constraints and Specifications Constraints: What it can’t do/be (Team picks top 4-5) Specifications: What it can do/be (Team picks top 4-5) Generate Concepts (5/23 – 5/27) At least three sketches/member on Isometric Paper for proposals Take pictures of your proposals in include in PowerPoint and share with partners Develop a Solution (Tuesday 5/27) Use a decision matrix to evaluate the design proposals based on your Specifications and Constraints Include Decision Matrix in PowerPoint Create Part files in Inventor Construct and Test a Prototype (6/1 - 6/3) Delegate who will do what on your team. Look at extensions, and enhancements that go beyond the minimum requirements Create a CAD model and complete set of working drawings for your solutions Put Screen Captures into the PowerPoint Assembly (6/3) (Animation Extra Credit ) Showing how all of the parts fit together and interchangeability of enhancements as appropriate Screen Capture of Assembly included in the PowerPoint Create a Team PowerPoint Presentation and tri-fold brochure (optional) marketing your solution (Monday 6/6) Prepare your presentation to the Shark Tank Class Presentations (6/8)

26 To do Today Email the rest of your virtual Team Start communication on
Introduce yourself Start communication on Team Norms Interactions File Naming Structure Communication (When, how, ) Specifications (Things the product can do) Constraints (Limits, things you can’t do) Start Developing Concepts Isometric Graph Paper ( 3 per Student)


Download ppt "Mall of America (MOA) Request for Proposals"

Similar presentations


Ads by Google