TTC System Status May 2007 System overview Production Status

Similar presentations


Presentation on theme: "TTC System Status May 2007 System overview Production Status"— Presentation transcript:

1 TTC System Status May 2007 System overview Production Status
Software and Firmware Support Sophie BARON, PH-ESS LEADE,

2 Upgrade history : Agreement between PH and AB/RF on the upgrade of the system, including maintenance and support issues Specifications of the new system 2006: Design of new modules for the system (and for AB/RF transmission links in general) RF_Tx and RX_Rx Analog modules RF_Tx and RX_Rx Digital modules RF2TTC TTC fanout Prototypes validation Fibres installation request 2007: Final versions validation Production Readiness Review in February Production Fibres installation Sophie BARON, PH-ESS LEADE,

3 TTC UPGRADE [overview]
CMS CCR – TTC support ALICE LHCb ATLAS Sophie BARON, PH-ESS LEADE,

4 Global results of the full system
All the complete tests results are available on the TTC-upgrade web site or on the PRR site (indico server): Sophie BARON, PH-ESS LEADE,

5 System overview Production Status Software and Firmware Support
Sophie BARON, PH-ESS LEADE,

6 VME_CRATES Used Distributed Status Support Paid by Crate (ALICE) 1 Power supply being prepared by Wiener ESS Crate (ATLAS) Pool item Crate (CMS) Crate (LHCb) Crate (CCR-ESS) Crate (ESS support) TOTAL 6 5 Status: Ordered and received. All have been distributed except ALICE. Sophie BARON, PH-ESS LEADE,

7 VME CRATE CONTROLERS Status: Delivered (except for ALICE) Used
Distributed Status Support Paid by VP315 (ALICE) 1 Available ESS VP110 (ATLAS) Pool item A V2718 (CMS) V1718 (LHCb) VP110 (CCR-ESS) VP110 (ESS support) TOTAL 6 5 Status: Delivered (except for ALICE) Sophie BARON, PH-ESS LEADE,

8 RF_Tx Production Status:
Used Hot Spares Cold Extra TOTAL Status Delivery Paid By Support Tx (SR4) 2 1 5 PreProd Sept Exp AB/RF Tx (CCR) 4 10 Production Status: Final version (V2) being produced now (as a preproduction) (see P. Baudrenghien’s slides) Production launched in July Equipment available in Septembre Used boards installed in AB/RF area All the spare boards will be kept and managed by AB/RF Sophie BARON, PH-ESS LEADE,

9 RF_Rx Production Status:
Used Hot Spares Cold Extra TOTAL Status Delivery Paid By Support Rx (ALICE) 2 1 5 PreProd Sept Exp AB/RF Rx(ATLAS) Rx(CMS) Rx(LHCb) Rx(CCR- ESS) 10 25 Production Status: Final version (V2) being produced now (as a preproduction) (see P. Baudrenghien’s slides) Production launched in July Equipment available in Septembre Used boards and hot spares installed in experimental areas All the other spare boards will be kept and managed by AB/RF Sophie BARON, PH-ESS LEADE,

10 RF2TTC Production Status:
Used Hot Spares Cold Extra TOTAL Status Delivery Paid By Support Rx (ALICE) 1 4 Prod June Exp PH/ESS Rx(ATLAS) Rx(CMS) Rx(LHCb) Rx(CCR- ESS) 5 20 Production Status: Final version (V3) has been validated and is now being produced Equipment available in June RF2TTC kit is available (RF2TTC, RF_Rx, RF_Tx, Fanout cables) and still being used by experiments A second RF2TTC can be lent if required Used boards and hot spares installed in experimental areas All the other spare boards will be kept and managed by PH/ESS Sophie BARON, PH-ESS LEADE,

11 TTC Fanout Production Status:
Used Hot Spares Cold Extra TOTAL Status Delivery Paid By Support Rx (ALICE) 2 4 Prod July Exp PH/ESS Rx(ATLAS) 1 Rx(CMS) 6 Rx(LHCb) Rx(CCR- ESS) 9 7 16+2 Production Status: Final version (V2) has been validated and is now being produced. Production launched now. Equipment available in July Used boards and hot spares installed in experimental areas Cold spares will be kept and managed by PH/ESS Sophie BARON, PH-ESS LEADE,

12 Other Equipment SMA to LEMO cables: Optical Patches Attenuators
Made by C. Sigaud, PH/MIC 7 per experiment (6 + spare) will be delivered with the RF2TTC Optical Patches Being ordered now to Fibernet Please answer to my about the fibre lengths Attenuators 6, 10 and 20dB will be ordered now to Fibernet Sophie BARON, PH-ESS LEADE,

13 PH/ESS already paid in advance for
Money Matters PH/ESS already paid in advance for Part of the fibre installation Components for production of the RF2TTC Part of the components for the RF_Tx and RF_Rx modules A cost estimation of the modules production and of the fibres installation will be sent to the TTC coordinators of all the experiments this week After approval, a TID will be sent to each of them, to finance the work being done now Sophie BARON, PH-ESS LEADE,

14 System overview Production Status Software and Firmware Support
Sophie BARON, PH-ESS LEADE,

15 Software Software Firmware Complete API will provide
RF_Rx control and monitoring RF2TTC control with calibration routines RF2TTC test procedure Portability to CCT controllers and CAEN PCI/USB interfaces The frequency received by each Rx will be published on the DIP for the RF Firmware RF2TTC firmware is done Will be used by the experiments during the summer Can be re-discussed end of September if some new functionnalities are required. Sophie BARON, PH-ESS LEADE,

16 System overview Production Status Software and Firmware Support
Sophie BARON, PH-ESS LEADE,

17 SYSTEM SUPPORT In case of troubles…..
First tests (module exchange with a spare if available) Piquet Support (working hours technical help) Maintenance Crate (bin, fantray, power supply) Exp X PH/ESS POOL Crate controller Transmission quality (RF_Tx) AB/RF RF_Rx RF2TTC Fanout Special components (6dB attenuators, SMA to Lemo adaptors) Sophie BARON, PH-ESS LEADE,

18 TTC GENERAL SUPPORT I will be away from mid-May until end of September
Stephane DETRAZ PH/ESS) will take care of the support, maintenance and help to installation during this time TTC upgrade modules Production tests Distribution to users Technical help for the setup of the TTC upgrade system Follow-up of the fibres installation (with Nicolas Zaganidis, TS/EL) Technical questions about TTC system… Be kind, Stephane is just beginning and he is not at 100% on the TTC project! We will send an to the TTC coordinators with all the required information All the necessary documentation will be stored on the TTC-upgrade web page and could be sent on request by Stephane I will read my s on a (un)regular weekly basis Sophie BARON, PH-ESS LEADE,

19 DOCUMENTATION Project web page: System test report:
System test report: RF_Rx (&Tx): The following information is available from the web site: OCP-STX and SRX modules datasheet TRR-1B datasheet First evaluation of the SDH/SONET and TRR transmitters and receivers Final test of the Version1 modules EDMS Schematics and Layout of the RF_Tx_D: EDA-01380 EDMS Schematics and Layout of the RF_Rx_D: EDA-01382 RF_Tx_D User Manual RF_Rx_D User  Manual CVS repository for RF_Tx_D and RF_Rx_D graphical control panels (tcl&tk panels) Money spent for the RF_Tx_D and for the RF_Rx_D: RF2TTC: The following information is available from the web site: Design Review: TTC project page on the Indico Server RF2TTC User Manual - last submission: 30/01/2007 RF2TTC test results Schematics and Layout of the RF2TTC: EDA-01357 CVS repository for RF2TTC control software Analysis of the board layout with SpecctraQuest, made by Alexandra Dana Oltean Karlsson, to understand the differences between the BCref and the other Clock paths (40ps rms jitter instead of 26): board analysis, vias extraction VHDL code of the FPGA. Money spent of the RF2TTC Sophie BARON, PH-ESS LEADE,


Download ppt "TTC System Status May 2007 System overview Production Status"