Presentation is loading. Please wait.

Presentation is loading. Please wait.

October 24, River Mile 0.5R along the American River

Similar presentations


Presentation on theme: "October 24, River Mile 0.5R along the American River"— Presentation transcript:

1 October 24, 2014 - River Mile 0.5R along the American River
In anticipation of the restoration project transplanting some site preparation had been done along the upland consisting primarily of weed and trash removal.

2 Winter 2014 – Site Preparation (Weed Removal)

3 Winter 2015 – Site Preparation (Transplanting Elderberry Shrubs)
September 30, 2015 – Construction is Underway

4 October 2015 – Construction Continues (Grading & Instream Woody Material Placement)
The site is nearly at the finish grade and the placement of the instream woody material (IWM) along the shore line has begun.