1
October 24, 2014 - River Mile 0.5R along the American River
In anticipation of the restoration project transplanting some site preparation had been done along the upland consisting primarily of weed and trash removal.
2
Winter 2014 – Site Preparation (Weed Removal)
3
Winter 2015 – Site Preparation (Transplanting Elderberry Shrubs)
September 30, 2015 – Construction is Underway
4
October 2015 – Construction Continues (Grading & Instream Woody Material Placement)
The site is nearly at the finish grade and the placement of the instream woody material (IWM) along the shore line has begun.