Presentation is loading. Please wait.

Presentation is loading. Please wait.

Logistics Metric Analysis Reporting System REPORTS As of May 2017

Similar presentations


Presentation on theme: "Logistics Metric Analysis Reporting System REPORTS As of May 2017"— Presentation transcript:

1 Logistics Metric Analysis Reporting System REPORTS As of May 2017
Kenneth R. Deans, DLMS PMO July 20, 2017

2 Logistics Metric Analysis Report System
LMARS Output Reports: . C Fill Type Sub-Sections. Each major report category section is further sub-divided into six Fill Type Sub-Sections: 1. Total (Composite) 2. Immediate Fill (identified as fill type A in the fill-type table) 3. Planned DVD (fill type B) 4. Backordered (fill type C) 5. Unplanned DVD (fill type D) 6. Other (fill type O). No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

3 Logistics Metric Analysis Report System
LMARS Output Reports: . C Output Reports. All Reports are displayed in a standard format. The titles of the Major Report Categories, the Sections, and the Sub-sections are all centered on report pages. Guard Reserves Wholesale ICP Contractor Wholesale ICP Wholesale ICP Reparables NSNs ICP GSA No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

4 Logistics Metric Analysis Report System
LMARS LRT Reports: Guard C “GUARD” Report. To be included in the Guard Report, the document number’s Ship-To address or Consignee must be an identified Guard DoDAAC. Note that the document numbers included in the Guard Report are not included in the Composite Report, paragraph C above. DLA Transaction Services maintains an internal table of DoDAACs supplied by the Components that identifies Guard unit DoDAACs. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

5 Logistics Metric Analysis Report System
Composite Guard Report Total Composite Guard LRT Total Orders: 169,549 Total Receipt Times in days: 19.4

6 Logistics Metric Analysis Report System
Composite Guard Report Reduced from 20.2 to 19.4

7 Logistics Metric Analysis Report System
LMARS LRT Reports: Reserve C “RESERVE” Report. To be included in the Reserve Report the document number’s Ship-To address or Consignee must be an identified Reserve DoDAAC. Note that the document numbers included in the Reserve Report are not included in the Composite Report, paragraph C above. DLA Transaction Services maintains an internal table of DoDAACs supplied by the Components that identifies Reserve unit DoDAACs. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

8 Logistics Metric Analysis Report System
Composite Reserve Report Total Composite Reserves LRT Total Orders: 33,973 Total Receipt Times in days: 35.9

9 Logistics Metric Analysis Report System
Composite Reserve Report Increased From 34.5 to 35.9

10 Logistics Metric Analysis Report System
LMARS LRT Reports: Wholesale ICP C “Wholesale ICP” Report. The Composite Report includes all document numbers eligible for LMARS reporting in a given month with the exception of those for Guard, Reserve, or Contractor DoDAACs. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

11 Logistics Metric Analysis Report System
Composite Wholesale ICP Report Total Composite Wholesale ICP LRT Total Orders: 2,429,547 Total Receipt Times in days: 11.7 Total 95% Composite Wholesale ICP LRT Total 95% Orders: 2, Total Receipt Times in days: 8.8

12 Logistics Metric Analysis Report System
Composite Wholesale ICP Report Decreased Total from 12.2 to 11.3 days 95% TPT 9.2 to 8.8days

13 Logistics Metric Analysis Report System
LMARS LRT Reports: Contractor Wholesale ICP C “CONTRACTOR” Report. To be included in the Contractor Report the document number’s Ship-To or Consignee address must be an identified Contractor DoDAAC. Note that the document numbers included in the Contractor Report are not included in the Composite Report, paragraph C above. Contractor DoDAACs are identified according to Table H. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

14 Logistics Metric Analysis Report System
Composite Contract Wholesale ICP Report Total Composite Contract Wholesale ICP LRT Total Orders: 56,974 Total Receipt Times in days: 7.9

15 Logistics Metric Analysis Report System
Composite Contract Wholesale ICP Report Increased from 7.1 to 7.9

16 Logistics Metric Analysis Report System
LMARS LRT Reports: Wholesale ICP Reparable NSNs C “REPAIRABLE NIIN” Report. The Reparable NIIN Report includes a subset of the document numbers in the Composite Report. To be included in the Reparable NIIN report the NIIN being ordered on a given document number must be identified as a Reparable NIIN by at least one Service. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

17 Logistics Metric Analysis Report System
Composite Wholesale ICP Reparable Report Total 95% Composite Wholesale Reparable ICP LRT Total 95% Orders: 33,566 Total Receipt Times in days: 29.3 Total Composite Wholesale ICP Reparable LRT Total Orders: 35,566 Total Receipt Times in days: 44.1

18 Logistics Metric Analysis Report System
Composite Wholesale ICP Reparable Report Reduced from 51.4 to 44.4 95% TPT 34.0 to 29.3

19 Logistics Metric Analysis Report System
LMARS LRT Reports: ICP GSA “ICP GSA” Report. The ICP GSA Report includes all document numbers eligible for LMARS reporting in a given month with the ICP as GSA and exception of those for Guard, Reserve, or Contractor DoDAACs. No goal exists for this metric due to dependency on other variables (TDDs, Supply Availability Goals etc.)

20 Logistics Metric Analysis Report System
Composite GSA ICP Reparable Report Total 95% GSA Wholesale ICP LRT Total 95% Orders: 72,927 Total Receipt Times in days: 63.7 Total Composite GSA ICP LRT Total Orders: 76,763 Total Receipt Times in days: 72.5

21 Logistics Metric Analysis Report System
Composite GSA ICP Reparable Report Increased from 60.6 to 72.5 95% TPT 50.2 to 63.7


Download ppt "Logistics Metric Analysis Reporting System REPORTS As of May 2017"

Similar presentations


Ads by Google