Presentation is loading. Please wait.

Presentation is loading. Please wait.

3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2

Similar presentations


Presentation on theme: "3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2"— Presentation transcript:

1 3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R5-120026 Draft v2
3GPP TSG RAN#55 Xiamen, PR China 28 Feb – 02 Mar 12 Status Report of RAN WG5 to TSG-RAN #55 3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2

2 Activity since RP#54 part 1
RAN5#54 was held in Dresden, Germany over the period 6 – 10 Feb 12; around 85 signed the attendance sheet Fredrik Sundström (Ericsson) was re-elected by acclamation, for the position of (RF) Vice Chair on the first day of the meeting – slide 4 refers 4xx non TTCN CRs were RAN5 agreed of which x were agreed after the meeting using the RAN5 review process (about 1.5%) Of the non TTCN CRs, 1xx were UTRA and 2xx were LTE related; about a split UTRA/LTE x non-TTCN CRs raised by TF 160 are going directly to the Plenary for approval (post meeting housekeeping) In addition x5 TTCN CRs were RAN5 agreed using the normal agreement process 5 work items were completed at RAN5#54 and 2 WI proposals were RAN5 endorsed and are being presented for approval - slide 8 refers Rel 10 Carrier Aggregation is gathering momentum with a number of CRs being agreed and the firming up of the work plan – slide 10 refers The CR objected to by Verizon at RAN#54 (Dec 12) was resubmitted and agreed by RAN5 in Dresden without comment

3 Activity since RP#54 part 2 tbc
A TF 160 has developed virtually all of the LTE priority 1, 2, 3 & 4 test cases; progress as at 24 Feb 12 shown below; FDD delivered out of 447, of which 346 are verified TDD delivered out of 429, of which 277 are verified Based on the most recent details of voluntary contributions, there is still an estimated 1x man month short fall to meet the 2012 task list TF160 status report provides more details of the above to be provided in the presentation in RP later

4 RAN5 Leadership Chair Phil Brown NTT DoCoMo Inc
Position Incumbent Company Chair Phil Brown NTT DoCoMo Inc Vice Chair & Sig Convenor Jacob John Motorola Mobility Vice Chair & RF Convenor Fredrik Sundström Ericsson MCC Support Ingbert Sigovich MCC RF Assistant Hany El Saidany Broadcom Sig Assistant Xiaozhong Chen CATT STF 160 Manager Shicheng Hu

5 Active WI/SI Progress @ RP#55 part 1
Work/Study Item rapporteur status TCD change status report Positioning Support for LTE Qualcomm 100% RP CT1 aspects for IMS Emergency Calls over GPRS and EPS Samsung 85% Jun-12 + 3 mths RP Support for different bands for Dual-Cell HSDPA Ericsson RP Dual-Cell HSUPA 80% RP Service Specific Access Control NTT DOCOMO RP Public Warning Systems (PWS) - RAN aspects for LTE 15% Dec-12 RP LTE 3500 90% RP UMTS 3500 RP MIMO operation with non-MIMO coexistence in HSDPA RP

6 Active WI/SI Progress @ RP#55 part 2
Work/Study Item rapporteur status TCD change status report Expanded 1900 MHz Band for UTRA and LTE Sprint 55% Jun-12 +3 mths RP Minimisation of Drive Tests (MDT) for E-UTRAN and UTRAN Ericsson 20% Sep-12 RP Carrier Aggregation for LTE Nokia 10% Dec-12 RP Automatic Neighbour Relation (ANR) for UTRAN 5% RP Four Carrier HSDPA Qualcomm RP UL multiple antenna transmission for LTE Huawei RP Further enhancements to MBMS for LTE 100% RP Extending 850 MHz Upper Band (814 – 849 MHz) RP UE Over The Air (Antenna) - Laptop mounted eqpt Free Space test ZTE 70% RP UE demod perf reqts under multiple-cell scenario for 1.28Mcps TDD CMCC RP

7 Outgoing Liaison Statements
Tdoc Subject To Copy R Clarification of UE behaviour when operating in CS-PS mode 1 of operation CT1 R E-UTRA/EPC Protocol Test Cases – Bandwidth Update for TDD Band 39 (response) GCF CAG PTCRB R Requesting clarification of whether the UE’s Whitelist is updated after Manual Selection to Hybrid CSG Cell RAN2 R RP Status of introduction of alternative measurement method for TRP/TRS in TS GCF PAG, CTIA OTA Antenna WG TSG RAN R RP Enabling operation of 4 Tx support in LTE networks (response) RAN4

8 Work Item Proposals for approval
Tdoc Subject Rapporteur TCD R RP-120XXX Support for Enhanced ICIC for non-CA based deployments of heterogeneous networks for LTE Qualcomm Dec 12 R Support for HeNB Mobility Enhancements

9 Specifications for info/ approval - nil
Tdoc# Title Purpose

10 Rel 10 Carrier Aggregation
CA conformance work started to progress in each area: RAN5#54 updated the work plan (R ), which identifies 50 RF/RRM TCs and 17 Protocol TCs, but these figures will increase for RF/RRM due to RAN4 work RRM TC work has started earlier than expected General agreements Signalling group finalised the TC work plan and assigned actions to the group for creating the test environment in TS RF agreed on CA test space setup and will now move onto setting up actual test environment and discussing test details RF group is aware there are upcoming minimum requirement additions with an increase to the number of TCs and potential impact to WI completion at RAN#58 Market demand to complete on time may require a specific purpose RAN5 ad-hoc to be arranged, probably in October RAN5 work for Release 11 CA combinations may have an impact as well. To summarise: the WI is at 10% with solid CR progress and framework/ad-hoc discussions; Status Report in RP refers

11 Specifications whose releases are being raised after RAN#55
qty 34.108 34.109 34.114 To Rel 11 34.122 To Rel 10 34.171 34.172 spec qty 34.902 36.508 To Rel 10 36.509 spec qty 36.903 37.901

12 Distribution of CRs spec qty 34.108 34.109 34.114 34.121-1 34.121-2
34.122 34.171 34.172 spec qty 34.902 36.508 36.509 spec qty 36.903 37.901 List of CRs from RAN5 can be found in RP In summary there are 4xx CRs (of which 2 are going directly) plus 1xx TTCN CRs for approval

13 Packages of Agreed CRs - part 1 maintenance activity & TTCN
area Tdoc# TEI_Test RP-120xxx TEI4_Test TEI5_Test TEI6_Test TEI7_Test TEI8_Test TEI9_Test TEI10_Test Annex A (Prose) area Tdoc# (TTCN) RP-120xxx (Prose) Annex A (Prose) TTCN LTE RF LTE Sig

14 Packages of Agreed CRs - part 2 active work/study items
work item Tdoc# Positioning Support for LTE RP-120xxx CT1 aspects for IMS Emergency Calls over GPRS and EPS Support for different bands for Dual-Cell HSDPA Dual-Cell HSUPA Service Specific Access Control Public Warning Systems (PWS) - RAN aspects for LTE LTE 3500 UMTS 3500 MIMO operation with non-MIMO coexistence in HSDPA work item Tdoc# Expanded 1900 MHz Band for UTRA and LTE RP-120xxx Minimisation of Drive Tests (MDT) for E-UTRAN and UTRAN Carrier Aggregation for LTE Automatic Neighbour Relation (ANR) for UTRAN Four Carrier HSDPA UL multiple antenna transmission for LTE Further enhancements to MBMS for LTE Extending 850 MHz Upper Band (814 – 849 MHz) UE Over The Air (Antenna) - Laptop mounted eqpt Free Space test SI: UE Application Layer Data Throughput Performance

15 Meeting Schedule 2012/13 Meeting Confirmed Dates Location Host
RAN5 #55  21 – 25 May 12 Prague EF3 Co-located with RAN1, 2, 3 & 4 RAN5 #56  13 – 17 Aug 12 Qing Dao Huawei RAN5 #57  05 – 09 Nov 12 Baltimore, US Spirent Communications & PCTEST RAN5 #58 28 Jan – 01 Feb 13 Malta RAN5 #59  20 – 24 May 13 TBC RAN5 #60 05 – 09 Aug 13 Porto, Portugal RAN5 #61 11 – 15 Nov 13

16 many thanks thanks, and now to the rest…


Download ppt "3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2"

Similar presentations


Ads by Google