Presentation is loading. Please wait.

Presentation is loading. Please wait.

2007 Spring Interim F2F (OGSA-17)

Similar presentations


Presentation on theme: "2007 Spring Interim F2F (OGSA-17)"— Presentation transcript:

1 2007 Spring Interim F2F (OGSA-17)
Day 3 agenda and general session 16 March, 2007 9am-noon PDT OGSA-WG #17 Interim F2F Oracle Headquarters Redwood shores, CA

2 OGF IPR Policies Apply “I acknowledge that participation in this meeting is subject to the OGF Intellectual Property Policy.” Intellectual Property Notices Note Well: All statements related to the activities of the OGF and addressed to the OGF are subject to all provisions of Appendix B of GFD-C.1, which grants to the OGF and its participants certain licenses and rights in such statements. Such statements include verbal statements in OGF meetings, as well as written and electronic communications made at any time or place, which are addressed to: the OGF plenary session, any OGF working group or portion thereof, the OGF Board of Directors, the GFSG, or any member thereof on behalf of the OGF, the ADCOM, or any member thereof on behalf of the ADCOM, any OGF mailing list, including any group list, or any other list functioning under OGF auspices, the OGF Editor or the document authoring and review process Statements made outside of a OGF meeting, mailing list or other function, that are clearly not intended to be input to an OGF activity, group or function, are not subject to these provisions. Excerpt from Appendix B of GFD-C.1: ”Where the OGF knows of rights, or claimed rights, the OGF secretariat shall attempt to obtain from the claimant of such rights, a written assurance that upon approval by the GFSG of the relevant OGF document(s), any party will be able to obtain the right to implement, use and distribute the technology or works when implementing, using or distributing technology based upon the specific specification(s) under openly specified, reasonable, non-discriminatory terms. The working group or research group proposing the use of the technology with respect to which the proprietary rights are claimed may assist the OGF secretariat in this effort. The results of this procedure shall not affect advancement of document, except that the GFSG may defer approval where a delay may facilitate the obtaining of such assurances. The results will, however, be recorded by the OGF Secretariat, and made available. The GFSG may also direct that a summary of the results be included in any GFD published containing the specification.” OGF Intellectual Property Policies are adapted from the IETF Intellectual Property Policies that support the Internet Standards Process. IPR Notices Note Well for OGF meetings 2

3 Friday agenda Mar. 16, Friday Morning (9am - noon)
Breakfast (8:30-9am) EMS design team (Andrew and Andreas, 9-10:30am) (This is expected to be a 1 hour session, reviewing current practice for information services) GIN information service by Morris Riedel GIN – Information Services and Schema (GIN – INFO) Break (15 min: 10:30am-10:45am) general session (Hiro, 10:45am-noon) OGSA leadership OGF20 sessions and one day F2F meeting on Friday telecom schedule Social study notification 3

4 OGSA leadership Tom will join by phone 4

5 Tasks Security (Express AuthN) Info/data modeling OGSA Profile interop
Andrew Grimshaw and Duane Info/data modeling Ellen Stokes OGSA Profile interop Hiro Kishimoto OGSA workflow Steven McGough and Michel Drescher Roadmap Chris Jordan Data grid usecase Chris Kantarjiev QoX issues Andrew Grimshaw and Steve McGough EMS-IS interface Andrew Grimshaw 5

6 OGF20 session plan 7(M)-11(F) May; Manchester Central; Manchester, UK
7(M)-10(Th): WG sessions OGF20 is with plenary and EGEE thus we can get less sessions (at most 3?) than OGF19 (5) 6

7 OGF20 related sessions GLUE-WG (+ OGSA-BES WG, JSDL-WG )
common session on information modeling of computing resources QoX ad hoc BoF (Andrew) Gauge people’s interest 7

8 OGSA-WG sessions at OGF20
two 90 minutes + three 45 min outreach sessions OGSA Express AuthN BP (45m) Andrew Grimshaw OGSA profile interop (45m) Hiro Kishimoto OGSA workflow (90m) Steven McGough and Michel Drescher OGSA data modeling: tag proposal (90m) Ellen Stokes EMS-IS session with INFO-D and GIN-INFO (45m) 8

9 OGSA F2F on May 11 (Fri) University of Manchester 9am – 6pm Apologies
Andrew Grimshaw, Mark Morgan, David Snelling 2 + 2 workshop style sessions? Info/data modeling Ellen Stokes OGSA workflow Steven McGough and Michel Drescher Data grid usecase Chris Kantarjiev 9

10 OGF20 Lodging Hotel Single Rate Double Rate
Radisson Edwardian £ BB £ BB The Midland Hotel £ BB £ BB Novotel City Centre £ BB £ BB Hilton Manchester Deansgate £ BB £ BB The rooms are only available on 06, 07 & 08th May 2007 Arora International £ BB £ BB Thistle Hotel £ BB £ BB BW Princess on Portland Hotel £ BB £ BB Britannia Portland Street £ BB £ BB Britannia Sachas Hotel £ BB £ BB Days Inn Manchester £ BB £ BB PTI Portland Street £ BB £ BB Ibis Hotel - Portland Street £ RO £ RO 10

11 Monday telecon time slot
The same as last year’s 11

12 Thursday telecon slot 30 minutes earlier than last year’s 12

13 Telecon Topics Monday Thursday Workflow usecase (Chris Kantarjiev)
Roadmap (Chris Jordan) Security (Andrew and Alan) 1st slot QoX (Andrew) 1st slot Thursday Information/data modeling (Ellen) Workflow (Steve and Michel) 2nd half Profile interop (Hiro) Glossary (Jem) EMS-IS (Andrew) 13

14 Telecon Schedule (1) 2007/3/19 Mon No-call 2007/3/22 Thur 2007/3/26
5-7pm CDT No-call 2007/3/22 Thur 8-10am CDT 2007/3/26 Workflow usecase (Chris Kantarjiev) Logistics 2007/3/29 Information/data modeling (Ellen) OGSA-AuthZ joint call 2007/4/2 Security (Andrew and Alan) Roadmap (Chris Jordan) 2007/4/5 Profile Interop (Hiro) 14

15 Telecon Schedule (2) 2007/4/9 Mon QoX (Andrew) Logistics 2007/4/12
5-7pm CDT QoX (Andrew) Logistics 2007/4/12 Thur 8-10am CDT Glossary (Jem) EMS-IS (Andrew) 2007/4/16 Workflow usecase (Chris Kantarjiev) Roadmap (Chris Jordan) 2007/4/19 EMS scenario PC review (Andreas) 2007/4/23 Security (Andrew and Alan) 2007/4/26 Info/data modeling (Ellen, Fred) Workflow (Steve and Michel) 2nd half 2007/4/30 No-call (Japanese holidays) 2007/5/3 15

16 2007 Summer F2F Date July, August, or early September Location ?? 16

17 Thank you 17

18 Document schedule (1) Document name Milestones Current Plan New
OGSA Security Profile 1.0 – Secure Channel First draft Sept. 2005 Ready for PC Feb. 2006 Publication Feb. 2007 OGSA roadmap v1.1 Nov. 2006 Mar. 2007 April 2007 June 2007 July 2007 completed delayed 18

19 Document schedule (2) Document name Milestones Current Plan New
OGSA EMS Architecture scenarios 1.0 First draft July 2006 Ready for PC Jan. 2007 Publication April 2007 OGSA EMS Architecture scenarios capability TBD (3~6 month) OGSA EMS Architecture Pending completed delayed 19

20 Document schedule (3) Document name Milestones Current Plan New
Guidelines for Information Modeling for OGSA Entities (explain necessary process) GFD-I First draft Jan. 2006 Ready for PC Feb. 2007 April 2007 Publication June 2007 container information model Information Modeling in OGSA XML schema and semantics Best practices GFD-R.P Also wiki page March 2007 April 2007 (doc) May 2007 (wiki) Aug. 2007 Dec. 2007 Information model profile document (BES container) Proof of concept TBD 20

21 Document schedule (4) Document name Milestones Current Plan New
OGSA Security Profile 1.0 – Express Authentication First draft May 2007 Ready for PC Oct. 2007 Publication Jan. 2008 completed delayed 21

22 OGSA profiles interoperability festa plan
In order to advance three GFD-P-R OGSA profiles to GFD-R status, we should have interop festa and write up experience document within 24 months OGSA Profiles WSRF Basic Profile 1.0 (Sept. 2006) Basic Security Profile 1.0 – core (Dec. 2006) Security Profile 1.0 – secure channel (Feb. 2007) WS-naming Participants UVa (Genesis II) FLE (UNICORE) ??? Schedule 22

23 interoperability festa plan
Genesis II UNICORE Globus Gridsam UNIVA NAREGI WSRF BP ? X BSP core SC WS-naming XX Hiro: announce and ask for participation Test scenario lead 23

24 Full Copyright Notice Copyright (C) Open Grid Forum (2007). All Rights Reserved. This document and translations of it may be copied and furnished to others, and derivative works that comment on or otherwise explain it or assist in its implementation may be prepared, copied, published and distributed, in whole or in part, without restriction of any kind, provided that the above copyright notice and this paragraph are included on all such copies and derivative works. The limited permissions granted above are perpetual and will not be revoked by the OGF or its successors or assignees. OGF Full Copyright Notice if necessary 24


Download ppt "2007 Spring Interim F2F (OGSA-17)"

Similar presentations


Ads by Google