1 Project Organization

2 From last Frascati collaboration meeting… Progress
Accelerator project organization: An organization structure has been set up. This is based on one organigramme where the roles and the responsibilities are defined The technical coordinator, the accelerator division and technical division leaders are identified Possibility to hire experts or young researchers Possibility to travel Contacts for MoUs And: Integration of a SASE FEL facility in the LINAC (M.Ferrario talk). This replace the Synchrotron beamlines. Request to produce in a very short delay a preliminary costing based on the ‘frozen’ CDR design

3 ACCELERATOR DEPARTMENT director A.VARIOLA
TECHNICAL COORDINATOR W.SCANDALE ACCELERATOR DEPARTMENT director A.VARIOLA DEPUTY DIRECTOR tbd SECRETARIAT tbd ACCELERATOR PHYSICS M. BIAGINI SC IP AND SOLENOIDS MAGNETS P.FABBRICATORE FINAL FOCUS IR INJECTION SYSTEM LINAC R.BONI INJECTION SYSTEM SOURCES DR and TL S.GUIDUCCI INSTRUMENTATION M.SERIO FEEDBACKS A.DRAGO CONTROLS G.MAZZITELLI RF RADIATION SOURCES M.FERRARIO MAIN RINGS M.Biagini TECHNICAL DEPARTMENT Director C.SANELLI SECRETARIAT tbd NORMAL CONDUCTING MAGNETS CIVIL ENGINEERING POWER CONVERTER M. SEDITA - INFN LNS VACUUM A. CLOZZA - INFN LNF MECHANICS S. TOMASSINI - INFN LNF ELECTROTECHNICS R. RICCI - INFN LNF HVAC & FLUIDS G. SCHILLACI - INFN LNS TECHNICAL SUPPORT CRYOGENICS C. LIGI - INFN LNF SAFETY A. CHIARUCCI - LNF GENERAL SERVICES PROCUREMENT & STORAGE

4 STATUS The machine has been studied in principle  CDR 1&2. We need an engineering document (TDR), a complete layout and the integration of the machine A long road. We need a lot of work to have a TDR in limited time. It is possible to work in parallel and produce an engineering report with a final footprint, without the production designs (that will come later) We need expert manpower and a good organization To have this we must be fully supported by the INFN accelerators expertise. We need also to sign MoUs with different institutes. We need to hire experts and researchers. In this context the Cabibbolab workability is crucial. EVERYTHING can be done, with hard work, provided the expertise and the motivation We need strong political support MOTIVATION: I think that we have a wonderful project and an incredible opportunity window. Only this should boost our motivations EXPERTISE: Collaboration between the best labs in the world. I personally think that the expertise present in INFN represent an absolute excellence WORK: Comes with motivation, support and organization

5 We face three phases: 1) Costing 2) TDR 3) Construction

6 Costing organisation:
Set up the experts team The work is based on a document. We defined its structure and his methodology A complete WBS file has been produced to integrate the different equipment costs For all the systems the experts are presently sending their documents describing their methodology, the kind of price estimates, the risks and the needed manpower. This will be integrated in the final document We had a ‘status’ meeting middle of may and one final meeting will take place 14th-15th June Costing, costing and costing….for this reason the participation in Elba is been reduced

7 Document 1) Introduction to the project and physics case.
2) Organisation and financing 3) Site and INFN accelerators science overview 4) Costing and spending profile 4.1) Costing Methodology 4.2) System and project total cost . 4.3) Risk analysis 4.4) Linac and damping ring key in -hand offer 4.5) Costing conclusions 5) General conclusions RESULTS for 15th JUNE. The document is complete and extremely professional. Thanks to all the INFN and IN2P3 (LAL, LPSC) staff that participated

8 What is the progress INFN request : costing based on the CDR lattice and technical solutions (error bar) in a very short delay (autumn – minister review) So from two months the costing has been our religion We have organized one team of people already working on SuperB and other INFN ‘volunteers’ and start the work to be ready the 15th of June A WBS consisting in more than 1600 elements has been created A international experts committee has been individuated to give an advice on the costing document (chair Gabriele Fioni – DSM/CEA France) Request for ‘key in a hand’ systems (Linac, DR). Based on performances and technical specifications

9 TDR Organisation TDR Goal: 1) Precise cost 2) Identify the R&D needs
3) Produce a machine layout 4) Froze the technological choices and the design 5) Have a precise planning Coordination : Groups and WG For TDR : to do list for main rings and Injectors WGs coordinated by Groups, they have a clear mandate Tasks flow chart (see next slide) Identification of the possible available and proposed manpower Fast reaction for MoUs and collaborations Fast and good : Start immediately after the costing =>t0 If the expert manpower is available and the organization works: TDR 1 V1 Lattice and machine footprint in few months TDR 2  Close the lattice and integration at least one year

10 TDR WG ACCELERATOR DEPARTMENT director A.VARIOLA TECHNICAL COORDINATOR
W.SCANDALE ACCELERATOR DEPARTMENT director A.VARIOLA DEPUTY DIRECTOR tbd SECRETARIAT tbd ACCELERATOR PHYSICS M. BIAGINI SC IP AND SOLENOIDS MAGNETS P.FABBRICATORE FINAL FOCUS IR INJECTION SYSTEM LINAC R.BONI INJECTION SYSTEM SOURCES DR and TL S.GUIDUCCI INSTRUMENTATION M.SERIO FEEDBACKS A.DRAGO CONTROLS G.MAZZITELLI RF RADIATION SOURCES M.FERRARIO MAIN RINGS M.Biagini TECHNICAL DEPARTMENT Director C.SANELLI SECRETARIAT tbd NORMAL CONDUCTING MAGNETS CIVIL ENGINEERING POWER CONVERTER M. SEDITA - INFN LNS VACUUM A. CLOZZA - INFN LNF MECHANICS S. TOMASSINI - INFN LNF ELECTROTECHNICS R. RICCI - INFN LNF HVAC & FLUIDS G. SCHILLACI - INFN LNS TECHNICAL SUPPORT CRYOGENICS C. LIGI - INFN LNF SAFETY A. CHIARUCCI - LNF GENERAL SERVICES PROCUREMENT & STORAGE TDR WG

11 Man power needs. It is not easy to find available expert manpower
We need to identify the WG, its mandate, the tasks and the experts/task. 11 WG ring, Final Focus and IP design and integration  Mandate : Finalise the design and the integration of the diagnostics for the IP. Integration in the optics of the main rings lattice possible FF design review, Near IP and FF layout A. Seryi JAI IP magnet design (perm quads and SC solenoids) P.Fabbricatore 2 INFN IP quads tolerances and stabilization E.Paoloni 2, 4 INFN, LAL Luminosity backgrounds S.Tomassini 3 IP feedback and correctors integration R.Bartolini 1 DIAMOND Synchrotron fans M.Sullivan 1, 6 SLAC Polarimeter integration P.Raimondi 1, 3 ESRF A.Perez Perez 4 Univ Pisa B.Bolzon 3 CERN A.Jeremie 3 LAPP C.Rimbault 4 LAL B.Brunetti 3 F.Bosi 1 A.Drago 5 LNF M.Sullivan 5 G.Christian 5 Moriccioni 7 Roma2 Messi 7 K.Moffet 7 F.Zomer 7

12 High Intensity Effects
Constraints Lattice Polarization LET FF&IP Vacuum Chamber Dynamic Aperture Lifetime Lattice Vn High Intensity Effects Luminosity diagnostic Luminosity Integration

13 Dafne status vs SuperB Dafne and luminosity
Present results are not relevant for the validation of Crab Waist. It would be important and useful to use DAFNE as a facility to study for instance the parametric dependences of the CW dynamics. This could be done on the basis of a shared scientific program during all the period from now to Superb completion. Need Manpower and the consensus of the INFN, LNF and the team

14 After and parallel to the TDR:
1. Prototyping 2. Technical Specification and drawing realization 3. Tender and contract award 4. Design for construction 5. Construction of components or systems 6. Firm tests of Components or systems 7. Transport and stockage 8. Installation 9. Components or system tests 10. Components or systems integration 11. Components or systems commissioning 12. Maintenance - wbs , pbs - Infrastructures - Administrative part - INTEGRATION - Manpower recrutement and collaborations

15 - Efficiency in management and administration
Planning is a ‘professionals’ work, requiring the analysis of a lot of parameters. This has to be done to have a precise estimation of the realizations period. Nevertheless … : If ALL THE CONDITIONS are in place we estimate that, with a success oriented planning, we can have beams in 6 years. 15th June can be the t0. - SuperB is a major accelerator project: - Efficiency in management and administration - Strong manpower support form INFN - Collaborations - Coherence