Download presentation
Presentation is loading. Please wait.
1
A330-200F Cargo Loading System
January 2013 Training 1
2
A330-200F Cargo Loading System
Training 2 Training Operation A F Cargo Loading System Training Operation
3
Caution Aircraft Floor has kink at Frame C58
Training 3 Training Operation Caution Aircraft Floor has kink at Frame C58 C58.1 FWD 1.375 Degree Pallet Cargo door Pallet Just Before the kink
4
Caution Aircraft Floor has kink at Frame C58
Training 4 Training Operation Caution Aircraft Floor has kink at Frame C58 C58.1 FWD 1.375 Degree Pallet Cargo door Pallet transiting through the kink
5
Door Sill Assembly Door Sill Assembly 5 FWD Training
Lower the door sill, and the raise side guides & rollout stop (left configuration). FWD
6
Loading Single Row Door Sill Assembly 6 Training
Lower the door sill, and the raise side guides & rollout stop (left configuration).
7
Door Sill Assembly Door Sill Assembly 7 Training
Lower the door sill, and the raise side guides & rollout stop (left configuration).
8
Single Row Loading 125X96 Or 88X125
Training 8 Single Row Loading 125X96 Or 88X125 1. Lower the Doorsill & raise side guides & rollout stop. FWD 2. Set alignment Guide at the door . 3. Verify all XZ Locks in the Ball Mat area are down and erect YZ Locks 4. Erect Z nose on FWD YZ latches. 2. Lower the Doorsill & raise side guides & rollout stop. 3. Verify all XZ Locks in the Ball Mat area are lowered and YZ Locks in the Ball Mat area are locked down. 4. Raise noted Pivot Rollers & pivots on the Double Overridables.
9
Park and Lock the pallet
Training 9 Door Sill Assembly Park and Lock the pallet Lower the door sill, and the raise side guides & rollout stop (left configuration). Hold the pallet not to move Erect latch by foot or by hand
10
Tall ULD Loading Single Row AMA Door Sill Assembly 10
Training 10 Door Sill Assembly Loading Single Row AMA Tall ULD Lower the door sill, and the raise side guides & rollout stop (left configuration). Watch for the aircraft ceiling
11
Training 11 Single Row Loading AMA 1. Lower the Doorsill & raise side guides & rollout stop. FWD 2. Set alignment Guide at the door . 3. Verify all XZ Locks in the Ball Mat area are retracted and erect YZ Locks 4. Erect Z nose on FWD YZ latches. 2. Lower the Doorsill & raise side guides & rollout stop. 3. Verify all XZ Locks in the Ball Mat area are lowered and YZ Locks in the Ball Mat area are locked down. 4. Raise noted Pivot Rollers & pivots on the Double Overridables.
12
Loading Double Row Door Sill Assembly 12 Training
Lower the door sill, and the raise side guides & rollout stop (left configuration).
13
Double Row Loading 125X96 Or 88X125
Training 13 Double Row Loading 125X96 Or 88X125 1. Erect Splitter to protect Centerline. FWD 2. Set alignment Guide at the door – Totally Lockdown for 96 X125. 3. Verify all XZ & YZ Locks in the Ball Mat area and Retracted 4. Erect Z nose on FWD YZ latches. 2. Lower the Doorsill & raise side guides & rollout stop. 3. Verify all XZ Locks in the Ball Mat area are lowered and YZ Locks in the Ball Mat area are locked down. 4. Raise noted Pivot Rollers & pivots on the Double Overridables.
14
16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading
Training 14 Agenda 16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading Summary 16’ and 20’ Loading Instructions
15
16’ and 20’ Loading Positions
Training 15 16’ and 20’ Loading Positions 1. Verify that all positions aft of the 16’ and 20’ pallets are loaded and secured. The 20’ pallets belong in positions CFG, FJG, and JLG. The 16’ pallets belong in positions CFG, FJG, JLR, and LPR.
16
16’ and 20’ Loading Preparation
Training 16 16’ and 20’ Loading Preparation 2. Lower the Doorsill & raise side guides & rollout stop. 3. Verify all XZ Locks in the Ball Mat area are lowered and YZ Locks in the Ball Mat area are locked down. 4. Raise noted Pivot Rollers & pivots on the Double Overridables. 2. Lower the Doorsill & raise side guides & rollout stop. 3. Verify all XZ Locks in the Ball Mat area are lowered and YZ Locks in the Ball Mat area are locked down. 4. Raise noted Pivot Rollers & pivots on the Double Overridables. FWD
17
16’ and 20’ Loading Preparation
Training 17 16’ and 20’ Loading Preparation 5. Lock down Cargo Locks, Splitter, Outboard Restraints, and Lateral Guides. 6. Lower noted Pivot Roller Assemblies. 7. Lock down Center Guides with ball units. 5. Lock down Cargo Locks, Splitter, Outboard Restraints, and Lateral Guides. 6. Lower Noted Pivot Roller Assemblies. 7. Lock down Center Guides with ball units. FWD
18
16’ and 20’ Loading Preparation
Training 18 16’ and 20’ Loading Preparation 8. Retract tongues of all Double Overridable Assemblies. 8. Retract tongues of all Double Overridable Assemblies. FWD
19
86240-10 Pivot Roller Assembly Pivot Roller Assembly 19 FWD Training
Raise the roller (left configuration) at indicated positions, and verify it is lowered in the ball mat area. FWD
20
86064-10 Pivot Roller Assembly Pivot Roller Assembly 20 FWD Training
Raise the roller (left configuration) at indicated positions. FWD
21
Pivot Roller Cross Track
Training 21 Pivot Roller Cross Track Pivot Roller Cross Track / Folding Assy Raise the roller (left) at indicated positions, and verify it is lowered in the indicated positions. FWD
22
86007-XX Side Restraint Assy Side Restraint Assy 22 FWD Training
Lock pawl in the down position (right) by using the lock down handle FWD
23
86065-10 Splitter Splitter 23 FWD Training
Lock splitter in the down position (right) by pulling the lock knob and folding it until the lever catches. FWD
24
Double Overridable Assembly
Training 24 Double Overridable Assembly Double Overridable Assembly FWD Retract the tongue (as shown in top right). The Pivot Roller ( /-11 only) can remain in the upright position, and the Flipper does not need to be adjusted.
25
16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading
Training 25 Agenda 16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading Summary 16’ and 20’ Unloading Instructions
26
16’ and 20’ Loading Procedure
Training 26 16’ and 20’ Loading Procedure 1. Bring pallet up to the limit line (red) in the Ball Mat area 2. Rotate the pallet, pivoting it about the Pivot Roller Assembly #1 3. Lift roller 4. Rotate the pallet, pivoting it about the Pivot Roller Assembly #2 5. Lift final two rollers. 1. Bring pallet up to the limit line (red) in the Ball Mat area 2. Rotate the pallet, pivoting it about the Pivot Roller Assembly #1 3. Lift roller 4. Rotate the pallet, pivoting it about the Pivot Roller Assembly #2 5. Lift final two rollers. #2 #1 FWD
27
16’ and 20’ Loading Procedure
Training 27 16’ and 20’ Loading Procedure 6. Move the pallet aft & locate it in position 7. Engage appropriate Double Assembly tongues to secure pallet as each pallet is inserted. May be necessary to rock pallet forward and aft to engage the first lock. Only engage the locks applicable to the installed pallet position. 6. Move the pallet aft & locate it in position 7. Engage appropriate Double Assembly tongues to secure pallet as each pallet is inserted. May be necessary to rock pallet forward and aft to engage the first lock. Only engage the locks applicable to the installed pallet position. #2 #1 FWD
28
86240-10 Pivot Roller Assembly Pivot Roller Assembly 28 FWD Training
Raise the roller (left configuration) at indicated positions, and verify it is lowered in the ball mat area. FWD
29
Double Overridable Assembly
Training 29 Double Overridable Assembly Double Overridable Assembly FWD Reengage the pawl, into the pallet’s pocket (as shown in top left) by engaging the tongue.
30
16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading
Training 30 Agenda 16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading Summary 16’ and 20’ Unloading Instructions
31
16’ and 20’ Unloading Procedure
Training 31 16’ and 20’ Unloading Procedure 1. Verify all Cargo Locks are down in Ball Mat area. 2. Verify noted Pivot Roller Assemblies are raised. 3. Verify YZ Locks & Splitter are locked down. 1. Verify all Cargo Locks are down. 2. Verify noted Pivot Roller Assemblies are raised. 3. Verify YZ Locks & Splitter are locked down. #2 #1 FWD
32
16’ and 20’ Unloading Procedure
Training 32 16’ and 20’ Unloading Procedure 4. Move the pallet forward up to the limit line (green). 5. Lower 3 of the pivots. 6. Rotate the pallet. First about Pivot Roller #2, and then about Pivot Roller #1, until the pallet is perpendicular to the CL of the aircraft. 7. Extract pallet from the aircraft. 4. Move the pallet forward up to the limit line (green). 5. Lower 3 of the pivots. 6. Rotate the pallet. First about Pivot Roller #2, and then about Pivot Roller #1, until the pallet is perpendicular to the CL of the aircraft. 7. Extract pallet from the aircraft. #2 #1 FWD
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.