FEB v2 Status Y. Favre 15 March 2017.

Similar presentations


Presentation on theme: "FEB v2 Status Y. Favre 15 March 2017."— Presentation transcript:

1 FEB v2 Status Y. Favre 15 March 2017

2 Reception of x6 FEBv2: 13 March 2017
Photo: 14 March 2017

3 FEBv2 in MiniCrate: 15 March 2017

4 Status 1/3 Status COMPLETED : Identical to FEB V1 functionalities
all power supplies are OK FPGA programming OK USB µC programming OK USB readout software recognizes the board & FPGA firmware version HV ON/OFF OK ASIC & FPGA parameters configuring OK Readout tests with 3 SiPM channels per ASIC OK

5 Status 2/3 Status TO BE DONE (new FEB V2 features):
Readout tests with all 96 channels (ETAM) SYNC IN/OUT (CLK + SYNC) Independent channel HV ON/OFF with RS485 HVON short-circuit/current limit test 5V µC HVON short-circuit/current limit test Addressing (Slots/MCR address) through backplane Programming through backplane GSTART/GRESET/GSPILL input test RX/TX 1Mb/s Protocol Chain Next/Prev Gigabit Readout Chain Housekeeping sensors

6 Status 3/3 Status TO BE DONE (new FEB V2 features, no priority):
AUX IN, TX OUT (not used in B-MIND) RTS/CTS 1Mb/s Protocol Chain (future use in B-MIND) 2nd Next/Prev Gigabit Readout Chain (future use to increase bandwidth in MCR chain in B-MIND)

7 First fingerplot: 14th March 2017
Baseline lowered compared to FEBv1 to increase dynamic range!!

8 Three channels per ASIC: ASIC 0

9 Three channels per ASIC: ASIC 1

10 Three channels per ASIC: ASIC 2