Download presentation
Presentation is loading. Please wait.
1
Move date to here rather than above and, for English version, in format: July 19, 2010
Adjust text alignment right Please pick up fields on BE for “Low*” and “High*” with 1 ‘*’ Insert “© Steel Business Briefing 2010”
2
Should be populated with current MTD price (i. e
Should be populated with current MTD price (i.e. average for July-10 to date). Label as ‘Jul-MTD’. Should be populated with current QTD price (ie. average for Q to date). Label column as ‘Q3 QTD’. Move all other data one column to the left, leaving room to include Q3’09.
3
Incorrect data. Do not recognise where this data has come from
Incorrect data. Do not recognise where this data has come from. Should be populated with data for most recent 2 weeks entered on BE under: Data entry/China Port Vessel Wait.
4
Incorrect chart. Should be line graph showing TSI 62% Fe spot price for past 12 months.
5
[ ] to be populated from BE/Data Entry/Iron Ore Normalisation Data/62% Fe Fines Coefficient (Latest data entered [ ] to be populated from BE/Data Entry/Iron Ore Normalisation Data/58% Fe Fines Coefficient (Latest data entered
6
Please create the necessary fields in the BE for a 4th set of contact details to be added (we need to add the USA details) under -Media Settings-Edit-Contacts. Reduce width of these boxes and insert 4th box in the same row.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.