Anne Arundel County Traffic Engineering Division Nestor A. Flores, P.E., PTOE Jones Station Road at Mago Vista Road Study March 22, 2017

2 Driving Behavior 1 2 4 3 5 Concerns: Right turn Speeds 2. Conflicts
with peds 3. Int. Crashes 4. Confusion with ROW assignment 5. Delays to stop controlled movements 1 2 4 3 5

3 Video Recording 13 Hours 10/18/16
Evaluation Video Recording 13 Hours 10/18/16 Crashes 3 crashes reported at the intersection from 1/1/13 – 12/31/16 2 angle, 1 single vehicle

4 Intersection Crash Diagram
3 1 2 Intersection Crash Diagram

5 Peak Hour Volume

6 New Stop Sign Locations __________________________________
Remove Right Turn Permitted W/O Stopping Sign Install New Stop Sign

7 Impacts Increased delay to intersection
AM: 4.8 secs per veh to 6.5 secs per veh PM: 7.1 secs per veh to 7.7 secs per veh Stop condition at Eastbound Jones Station Rd. AM: 1 sec per veh to 6.6 secs per veh PM: 1.5 sec per veh to 9.2 secs per veh Stop condition at Southbound Mago Vista Rd. AM: 3.3 secs per veh to 6.1 secs per veh PM: 2.2 secs per veh to 5.6 secs per veh

8 Benefits Standard 4-way stop eliminates motorist confusion/uncertainty
More manageable/safer for school crossing guard and pedestrian crossings in general Reduced delay for northbound, southbound and westbound movements WB (PM): 23.4 secs per veh to 12.2 secs per veh Can control excessive speeds and aggressive driving through and approaching intersection.

9 Modification Techniques
Add message boards two weeks prior to traffic pattern change Install warning signs with flashing beacons Install oversized stop signs with flashing beacons and/or flags - Install wider stop lines

10 Sample Intersection Strawberry Lake Way at Stream Valley Drive (Piney Orchard)

11 Traffic Engineering Division
Anne Arundel County Traffic Engineering Division Nestor A. Flores, P.E., PTOE


Download ppt "Traffic Engineering Division Nestor A. Flores, P.E., PTOE"

Similar presentations


Ads by Google