Download presentation
Presentation is loading. Please wait.
1
SILLY SEASON CAMPAIGN MOLOKO RAMAHUMA
2
Silly season campaign 1st November 2017 till 5th January 2018
COMPLIANCE TMM REGULATION & ENFORCEMENT ROAD SAFETY OCCUPATIONAL HEALTH AND MINE VENTILATION Check compliance on Early entry examination Safety/VOHE officers compliance audit, Odd shift analyse and communicate the results. Sectional PTO matrix /schedule to be monitored Contractor management Adherence to Life saving rules CLOSE OUT ACTIONS & NCR ISOMETRIX NCR to be closed out. Section 54/55 deviations to be tracked and closed out. Injury remedial actions to be implemented. Enforce adherence to the machinery regulations e.g. (artisan /S.Officers to audit the machines for PDS) Pre-use checklist to be analysed.- to have representative sample of checklist analysed ROAD SAFETY TIPS: Arrive alive- don’t drink and drive. Don’t talk/text on cell phone whilst driving Beware of pedestrian and animals. Always Obey Road Traffic rules Procedure is signed by the General Managers regarding CONTRIBUTING FACTORS TO POOR VENTILATION: Fan recirculation Inadequate planning and scheduling Use of single fan to ventilate multiple end heading. Poor knowledge of ventilation standard. WELLNESS FOCUS AREAS: Fatigue management- Compulsory alcohol/drug testing. Encourage employees who never tested to participate in the Voluntary counselling.(HCT) Employee Hearing Conservation Program.
3
We do want to see you again!
Silly season campaign The campaign started on the 1st of November Focus points: Road safety Attitude / Behaviour towards Safety Fatigue Management Adherence to mine rules Alcohol / Drug abuse Life saving rules We do want to see you again!
4
TRAINING Lesson plan
5
CLOSE OUT SECTION 54/ 55 ACTION TRACKER
No Finding Remedial Action put in place Resp. Person Comments Closed out Yes/No Score 1 No risk assessment in place for LV lighting transformer Conduct LV lighting transformer risk assessment P van Rooyen Complete Yes 2 The standard is not prescriptive in terms of LV lighting transformers and the following regarding LV lighting transformer: fire prevention fire combat transformer specification Installation and commissioning maintenance requirements Adherence to SANS 780 Review standard to include all Train relevant employees on new standard Update maintenance strategy 3 No fire prevention and fire combat equipment Install hand held fire extinguishers at LV transformers in underground workings Paint all LV transformers cableling with flame retardant paint for ±6m in underground workings Completed In progress Outstanding
6
CONTRACTOR MANAGEMENT WEEKLY FIELD REPORT
7
WELLNESS EVENT-PICTURES
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.