Cavity + He Vessel interface
MI
2
Introduce Cavity interface with He Vessel FPC interface with cavity
HOM Coupler interface with cavity
3
3D Model
4
3D Model
5
Cavity interface with He Vessel
Design Requirements Minimize Microphonics Fluctuations (dF/dP) Reduce Lorenz Force Detuning (LFD) Reduce Bellows Diameter All Stiffening Rings at 100mm Radius PIP-II 650MHz Cavity
6
C. Grimm | Mechanical Design of HB 650 Cavities
Design Issues MC Endgroup Endgroup Electron-Beam Welding Sequence 11/9/2015 C. Grimm | Mechanical Design of HB 650 Cavities
7
C. Grimm | Mechanical Design of HB 650 Cavities
Design Issues FP Endgroup Endgroup Electron-Beam Welding Sequence 11/9/2015 C. Grimm | Mechanical Design of HB 650 Cavities
8
C. Grimm | Mechanical Design of HB 650 Cavities
Design Issues MC Endgroup FP Endgroup Dumbbell Assembly Endgroup to Dumbbell Electron-Beam Welding 11/9/2015 C. Grimm | Mechanical Design of HB 650 Cavities
9
C. Grimm | Mechanical Design of HB 650 Cavities
Design Issues Cavity is Ready Degassing/Annealing Process at Minimum of T = 600 C Titanium Transition Titanium Bellows After Degassing/Annealing the Titanium Transition and Titanium Bellows are Electron-Beam Welded to the Endgroups 11/9/2015 C. Grimm | Mechanical Design of HB 650 Cavities
10
C. Grimm | Mechanical Design of HB 650 Cavities
Design Issues EBW Direction EBW Direction EBW Direction Close-Up of Titanium to Nb-Ti Electron-Beam Welding 11/9/2015 C. Grimm | Mechanical Design of HB 650 Cavities
11
C. Grimm | Mechanical Design of HB 650 Cavities
Design Issues Titanium Helium Tank Titanium Transition Ring Dressing the Bare Cavity with a Helium Vessel 11/9/2015 C. Grimm | Mechanical Design of HB 650 Cavities
12
C. Grimm | Mechanical Design of HB 650 Cavities
Design Issues TIG Weld #1 TIG Weld #2 TIG Weld #3 Glovebox TIG Welding 11/9/2015 C. Grimm | Mechanical Design of HB 650 Cavities
13
High beta 650 MHz dressed cavity
Internal magnetic shield Magnetic shield end cap 2/16/2016 Slava Yakovlev, PIP II linac: challenges, issues and status
14
3D Model
15
Beam pipe length decrease from 300mm to 200mm Design NEW tuner
3D Model: Beam pipe length decrease from 300mm to 200mm Design NEW tuner Main Coupler interface and position HOM Coupler interface and position
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.