CTOF Installation
2
Install ANCHOR BRACKETS onto UPSTREAM INTERFACE RING
4
Install CENTRAL NEUTRON DETECTOR onto UPSTREAM INTERFACE RING
7
Install support cones onto anchor brackets
8
Install counters #1 & #2; - Specially assembled, as the first of the array - Require special installation because of close proximity to the solenoid cart
9
Install common “left” or “right” counters (#3 through #45)
from the bottom up
10
Install common “left” or “right” counters (#3 through #45)
from the bottom up
11
All common “left” and “right” counters, Installed
12
46 & 47th are special assembly counters, to mount together at the inner cone
13
48th counter installed