Download presentation
Presentation is loading. Please wait.
1
Constructive Thinking
Sean Kelly MBE
2
Logistics Consolidation
City Boundary Consolidation Centre
3
Logistics Consolidation
City Boundary Consolidation Centre
4
Logistics Consolidation
City Boundary Consolidation Centre
5
Construction Consolidation
Site Consolidation Centre
6
Logistics Consolidation - EFFICIENCIES
Site Consolidation Centre
7
Construction Consolidation - EFFICIENCIES
Site Consolidation Centre
8
Construction Consolidation
City Boundary Consolidation Centre
9
Construction Consolidation
City Boundary Consolidation Centre
10
Construction Consolidation
City Boundary Consolidation Centre
11
Consolidation / Screening Centre
Construction Consolidation – Security Boundary Consolidation / Screening Centre Secure Vehicle Dirty Screening Clean
12
Construction Consolidation Security – Examples
13
Construction Consolidation – Examples
St Barts – Redevelopment A £330 Million pound redevelopment of Bart’s hospital Construction of a ‘state of the art’, 322 bed hospital Built on the footprint of the existing site Hospital to remain in full operation during project Limited space for works Located in the City of London Within the London Air Quality Management area, the Low emission zone, and congestion charge zone. Using consolidation: Number of journeys made into the City was reduced by 76% Reduced production of particulate matters within the Air Quality Management Area by ~21kg. Reduced Carbon dioxide exhaust emissions by 155 tonnes CO2eq (LCCC Journeys to Site Vs No of traditional direct to site Journeys required) Suppliers saved over £89k in congestion charges
14
Construction Consolidation – Examples
Heathrow – Q5 Development A £5 billion pound redevelopment of Heathrow Included construction of new Terminal 2 Built on the footprint of the existing site Airport to remain in full operation during project Limited space for works Located inside the operating airport Within the Security Restricted Area. Using consolidation: Number of journeys made into the Airport was reduced by 70% All movements made under security protocols Reduced production of particulate matters Reduced Carbon dioxide exhaust emissions Maintained operational airport.
15
Questions ? City of London Sustainable City Awards 2015:
Tackling Climate Change Winner Improving Air Quality Highly Commended
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.