NTU Proposal to join CMS Tracker on Pixel Upgrade Phase I
Tracker Institution Board, July 22, 2010 Tai - Wan Univ. NTU Proposal to join CMS Tracker on Pixel Upgrade Phase I George W.S. Hou National Taiwan University
2
Group Composition Intended Contribution Expertise/Experience Plan Miscellaneous
3
Group Composition Assoc. Fell. UE Prof. Belle Anaylsis Coordinator
Assist. Fell th/UE Assoc. Prof th Gen. Convenor, EXO * Prof [former KTeV spokesperson Assist. Fell ES/An Assist. Fell ES [now more on Belle II Prof [Belle Rare Convenor
4
Intended Contribution
Interest: Join Pixel Phase I, form CERN/Taiwan Center (Duccio and Anna) for 1/3 (of 1216) module production (and further), 1M CHF in Consumables (5 year period), with Manpower to match. Preproposal filed 12/2009 to “Academic Summit” Initiative of NSC - Preproposal approved April Advance to Proposal 5-year Proposal filed mid-May - Approved at Natural Science Department of NSC on June 30 - Final approval by Minister of NSC on August 2 Dedicated trip to PSI (Roland) on May 6, with above scenario CERN-PSI-NTU video conference May 11, reach mutual understanding [contact with domestic mirco bump bonding capabilities started
5
Expertise/Experience
EFC/Belle: Extreme Forward Calorimeter, Full subdetector based on rad. hard BGO SVD2/Belle (Upgrade), TTM (Trigger Timing Module) and flex pcb; Assembly ES/CMS, System MotherBoards (all) for Preshower; Assemby Pixel/Belle II, Joint R&D with KEK & Hawaii Pixel I/CMS, CERN/Taiwan Center for 1/3 module production; Assembly
6
EFC of Belle
7
TTM (Trigger Timing Module)
Belle SVD2 Upgrade flexible pcb NTU Contribution TTM (Trigger Timing Module) SVD2 Completed 3/2003 Installed Summer 2003 500 lines in 2 cm (20 um pitch) FPGAs From 3-layers of SVD1 to 4-layers + Self-tracking
9
Join SVD2 Upgrade of Belle ∵ Extra Funding :)
10
System MotherBoards for Preshower
Paolo Bartalini Chin-Chi Wang Yuan Chao Rong-Shyang Lu CERN ca. 11/2007 Jing-Ge Shiu
11
System MotherBoards for Preshower
2004 – NSC $ Paolo Bartalini Chin-Chi Wang Yuan Chao Rong-Shyang Lu CERN ca. 11/2007 Jing-Ge Shiu
12
Preshower Assembly/Installation (3/2009)
Installation at P5 First Dee Assembled Preshower on Endcap Cosmic Test Stand NCU NTU
13
New ! Plan Budget Manpower Schedule 1M CHF Consumables ⊕
Own Operation $ New Clean Room (for future development) Manpower ※ Rong-Shyang Lu [Paolo Bartalini] ⊕ ⋆ Ulysses Grundler (8/2010) ⋆ Tech. PD (9/2010) ∙ Assistant Students: ∙ You-Hao Chang (assigned) ∙ Charles Dietz (2011) … Schedule [follow Pixel I] de facto approved [5 yrs, extendable once Final approval: Minister ⇒ immediate execution New ! N.B. Sizable team still on ES
14
Miscellaneous ES/ECAL: Dave Barney (Deputy PM) informed; no problem w/ 0.25 FTE - Transfer of Expertise from Rong-Shyang Lu to students [Chia-Ming Kuo of NCU still around M&OB (current 17k CHF in ECAL; will reduce this a little) - When ES under construction, no direct M&OB ⇨ CAN THIS APPLY? NCU: Will not receive funds from this “Academic Summit” project - May seek to join forces with NTU by regular project in a couple of years
15
Kobayashi meets Taiwan President
Yours Truly arranged the visit … Kobayashi meets Taiwan President NTU President, Morris Chang (TSMC godfather) Yours Truly Minister of NSC (alumnus of NTU Physics)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.