1 Bidder’s conference – 21st May 2013
IT3937/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems for SR4 Facility Bidder’s conference – 21st May 2013 Y. Body / EN-CV

2 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

3 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

4 INTRODUCTION: CERN

5 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

6 INTRODUCTION: SR4 Facility

7 INTRODUCTION: SR4 Facility

8 INTRODUCTION: SR4 Facility

9 INTRODUCTION: SR4 Facility

10 INTRODUCTION: SR4 Facility – Former ventilation system

11 INTRODUCTION: SR4 Facility – Former ventilation system
Cut Top view

12 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

13 NEW VENTILATION SYSTEM
Two AHUs: one in R-401 and one in R-404 R-403 Alcove used for decompression R-401 R-404 R-403

14 R-401, R-404 alcoves NEW VENTILATION SYSTEM Air Handling Unit
Sepcial shape part between AHU and mixing chamber including the air tight access door Return air grille (UQGN) Fresh air intake (UQCF) Fresh air damper (UVUM) Return air damper (UVUM) Pre-filtration (UFPZ)

15 R-403 alcove NEW VENTILATION SYSTEM Retrun air exhaust (UQCF)
Return air grille (UQGN) Return air dampers (UVUM) Openings closure

16 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

17 (same principle for UIAC-00076)
TENDER DOCUMENTS: Technical Specification – Items supplied by CERN CERN 400Vac CERN main power supply (same principle for UIAC-00076) Control sofware done by CERN based on Contractor’s function/malfunction analysis, I/O list, PID and electrical diagrams

18 TENDER DOCUMENTS: Technical Specification – Design criteria and conditions

19 TENDER DOCUMENTS: Technical Specification – Applicable Standards, Rules, Regulations
Halogen forbiden AHUs: total amount of halogeneted material to be indicated in the tender

20 TENDER DOCUMENTS: Technical Specification – Responsibility for the Design

21 TENDER DOCUMENTS: Technical Specification – Documentation

22 TENDER DOCUMENTS: Technical Specification – Documentation

23 TENDER DOCUMENTS: Technical Specification – Documentation
The Contractor shall use a tool developed by CERN (as per section )

24 The software can be downloaded at
TENDER DOCUMENTS: Technical Specification – Documentation and CMMS tool The software can be downloaded at

25 Example of a Part (fan) in Parts-Admin software
TENDER DOCUMENTS: Technical Specification – Documentation and CMMS tool Example of a Part (fan) in Parts-Admin software CMMS Class code: Parts are grouped in large groups (Valves for example). Each group is a Class and has a defined code. CERN has a list of valid Classes. Each Category has a code. CMMS Category code: Classes are divided into smaller groups (Butterfly valves for example). These groups are called Categories. CERN has a list of valid Categories. Each Category has a code

26 TENDER DOCUMENTS: Technical Specification – Delivery schedule

27 TENDER DOCUMENTS: Technical Specification – Tests
1. I/O testing with basic PLC standard software suite (done by the Contractor) Power available in the cubicles and all equipment cabled to the PLCs Supplier able to charge the basic PLC configuration and test all I/Os from within the software 2. I/O testing with CERN software (done by CERN with presence of Contractor) Test report from phase one validated by CERN Setup of instrumentation is finished (scaling of analog probes, pressostats, …) All hardware responding to commands Contractor able to force all I/Os electrically 3. Functional testing with CERN software (done by CERN with presence of Contractor) All hardware and instrumentation operating according to specifications (failsafe positions on dampers, electrical equipment protections all working, etc) Ability to run the units and test regulation loops 4. Commissioning (done by CERN with the presence of Contractor) Installation able to work at the design envelope conditions (nominal flow and power, …)

28 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

29 TENDER DOCUMENTS: Annex 1 – Panel of the AHUs

30 TENDER DOCUMENTS: Annex 1 – Measuring section

31 TENDER DOCUMENTS: Annex 1 – Electrical heaters

32 Copper pipe with a thickness of 0.89 mm allowed
TENDER DOCUMENTS: Annex 1 – Chilled water coils Copper pipe with a thickness of 0.89 mm allowed

33 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

34 TENDER DOCUMENTS: Annex 2 – Instrumentation

35 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

36 TENDER DOCUMENTS: Annex 3 – Electricity

37 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

38 TENDER DOCUMENTS: Annex 4 – Identification

39 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

40 As per section 4.7.1 of the Technical Specification
TENDER DOCUMENTS: Annex 5 – Tests and Inspection performed on Contractor’s Premises As per section of the Technical Specification

41 INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS
PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

42 TENDER DOCUMENTS: Annex 6 – DQE

43 TENDER DOCUMENTS: Annex 6 – DQE - update

44 Thanks for your attention!