Download presentation
Presentation is loading. Please wait.
Published bySabrina Jacobs Modified over 6 years ago
1
Top 10 Considerations for Implementing a Parking Guidance System
James Maglothin, P.E., PMP Neill Hurley, CAPP Walker Parking Consultants June 29, 2015
2
Agenda PGS Industry Background Types of PGS
Defining the Success of Your PGS Top 10 Design Considerations
3
PGS Industry Background
Recent History of the PGS Industry Present-Day PGS Trends and Activity
4
Types of PGS Types of PGS Multi-facility PGS By Facility By Level
By Zone By Space Multi-facility PGS
5
Defining the Success of Your PGS
How is success defined? Set measurable goals Communicate goals to stakeholders Assess performance against goals How does design influence success? Achieves goals Does not drive up costs unnecessarily
6
Top 10 PGS Design Considerations
Top 10 Design Considerations – Each element has cost and operational impacts Customer Service Features and Functionalities Operational Features and Functionalities Web Site and Mobile Application Interfaces Detection Technology Sensor and Indicator Placement Infrastructure Procurement Contractor Vetting Installation Commissioning
7
Customer Service Features
Dynamic Signage
8
Customer Service Features
Find Your Vehicle
9
Operational Features Flexible Parking Space Assignments
Premium Parking Areas Time Violation Alerts Citation Officer Notification License Plate Hotlist Reporting Automatic Dimming/Power Off Integration with Facility Lighting System
10
Website and Mobile App Interfaces
Browser-Based vs. Client-Based Applications Broadcast Real-Time Space Availability Find Most Convenient Parking for Destination
11
Detection Technology Inductive Loops Ultrasonic Video Analytics
License Plate Recognition Infrared Laser
12
Sensor and Indicator Placement
Facility Count Level Count By Zone By Individual Space
13
Infrastructure Embedded Conduit Surface Mounted Conduit
Sensor and Signage Communication
14
Procurement Functional Specifications RFP vs. Bid Process
Include a Pre-Proposal Conference/Site Walk Value Based vs. Price Based Selection
15
Contractor Vetting Competitive Landscape US vs. Worldwide Presence
Installations of Similar Size and Complexity Components Client References Consider system cost vs. risk
16
Installation New Construction Existing Construction
17
Commissioning Measure Performance Against Clearly Defined Metrics
Software Acceptance Tests Device Acceptance Tests System Acceptance Tests
18
Thank You ? Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.