Presentation is loading. Please wait.

Presentation is loading. Please wait.

Implementation of Progressive Energy Efficiency Projects with Local Electrical Utility and California Energy Commission Grant Funding AWWA Cal-Nevada AFC.

Similar presentations


Presentation on theme: "Implementation of Progressive Energy Efficiency Projects with Local Electrical Utility and California Energy Commission Grant Funding AWWA Cal-Nevada AFC."— Presentation transcript:

1 Implementation of Progressive Energy Efficiency Projects with Local Electrical Utility and California Energy Commission Grant Funding AWWA Cal-Nevada AFC 2017 October 25, 2017

2 Cucamonga Valley Water District
Dynamic, growing organization whose sole purpose is to provide high quality, safe and reliable water and wastewater services, while practicing good stewardship of natural and financial resources. Culture and Values Service Water People

3 Service Rancho Cucamonga, portions of the cities of Upland, Ontario and Fontana, and some unincorporated areas of San Bernardino County 190,000 customers 47-square-mile 45,000 water connections 35,000 sewer connections

4 Water 2016 Production (CY) 41,600 Production Facilities
Ground Water – 29,400 AFT 29 wells Canyon Water – 1,200 AFT 3 Local Canyons Imported Water – 11,000 AFT 3 Surface Water Treatment Plants Production Facilities 69 Booster Pumps 35 Reservoirs 85 MG Storage

5 Water - Wells

6 Water - Boosters

7 Water - Distribution

8 People 130 Employees Innovative, empowered, and provide exceptional customer service Servant-oriented organization and provides Service Beyond Expectation to all customers

9 Energy Efficiency Philosophy
Provide a high quality, sustainable water supply that is safe, reliable, and delivered at a cost-effective price Transitioning the Production System Operation Strategy: Demand Based to Efficiency Based Leverage utility programs, grants and incentives to achieve innovative and verified energy savings while boosting performance of their system in ways that may be replicated by other agencies. Leveraging nearly $333,000 (grant/incentive) funding with anticipated annual savings of $449,000

10 Working Toward This Goal
CVWD Production and Controls Staff Third Party Consulting Honeywell Southern California Regional Energy Network (SoCalREN) Authorized by the California Public Utilities Commission to harness the collective power of residents, businesses, and the public sector to achieve an unprecedented level of energy savings across Southern California. Identify energy saving measures and work side-by-side from design through construction All services provided by SoCalREN are provided at no cost Arrange financing and handle the utility rebate incentive process on your behalf. Provide access to on-call, high-quality energy retrofit construction professionals through the National Joint Powers Alliance (NJPA).

11 Project Timelines/Value
2017 2015 2014 2012 Optimize Well Pump Sequencing Optimize Booster Pump Sequencing Optimize Booster Pump Sequencing 3 and 3a Pump Efficiency Improvements Automated Demand Response

12 2010-2012 Automated Demand Response
Southern California Edison’s (SCE) Technical Assistance Technical Incentives (TATI) Grant Goal Control System Upgrade/Participation in ADR Events Project Description $570K Grant Value 76 PLCs 6 Touch Screens 52 Radios 72 Antennas 6 Permanent Towers Timeline Concept: 11/10 Build: 8/11 3rd Party Verification: 2/12

13 2010-2012 Automated Demand Response
Results: FYE 2013 CPP Quantity: 12 Peak Hours 14:00 – 18:00 ADR Quantity: 2 Hours: 14:00 – 17:00 Aggregator Payments 2011 FYI 5 Sites - $13,482.94 2012 FYI Combination - $67,356 2013 FYI 22 Sites Automated Demand Response - $162,071.23 CVWD upgraded its control system (Programmable Logic Controllers, communications, and Human Machine Interface) in an effort to provide a structure to incorporate an energy efficiency operations strategy

14 Pump Efficiency Improvements
Goal Evaluate existing equipment for reasons of inefficiency and restoration of OEM specifications, or implement a design change to meet current system conditions Project Description CVWD worked together with The Energy Network using an SCE customized incentive of $0.08/kWh and $150/kW capped at 50% of project cost Thirteen vertical turbine pumps (4 wells/9 boosters) identified as operating outside of the acceptable plant efficiency (Boosters < 72%, Wells < 71%) Pull and repair the identified pumps Three requests for proposals/three separate contractors to pull and repair the pumps

15 Pump Efficiency Improvements
Results Each contract was completed on time, within budget, and efficiencies were brought up to acceptable levels Installed Measure Cost $720,986 Verified Incentives: $184,556 Verified Savings: 2,191,098 KWh/Year

16 Optimize Booster Pump Sequencing 3 and 3a
Goals The seven (7) booster pumps located at Stations 3 and 3A were identified as potentially benefiting from optimization of the booster pump sequencing with a goal of operating the optimum amount of vertical turbine pumps in the most efficient sequence Project Description The two pump stations boost well water from Reservoir 3 and 3A to Zone 4 Pump Station 3A Boosters kWh/AF kWh/AF kWh/AF Pump Station 3 Boosters kWh/AF kWh/AF kWh/AF kWh/AF Design of subzone 4 in zone 5

17 Optimize Booster Pump Sequencing 3 and 3a
Results Installation of 3 pressure regulating valves and booster sequencing programming This project was recognized as an area in need of stabilization and a capital improvement project was designated to address the pressure stabilization Installed Measure Cost $249,650 Verified Incentives: $56,543 Verified Savings: 2,191,098 KWh/Year

18 Optimize Well Pump Sequencing – In Progress
Goals 24 well pumps identified as potentially benefiting from sequencing Provide more frequent data to re-evaluate the pump sequencing Project Description Operational Efficiency determined by kWh/Acre Foot Installation/Integration of individual electrical sub-meters Energy data, system demand and water quality data to provide an operations strategy which incorporates an energy efficiency control strategy

19 Water - Wells

20 Optimize Well Pump Sequencing – In Progress
Results Installed Measure Cost $94,800.00 Estimated Incentives: $36,974.16 Estimated Savings: 462,177 KWh/Year

21 Optimize Booster Pump Sequencing – In Progress
Goals 47 booster pumps and 9 well identified as potentially benefiting from sequencing Project Description Re-evaluate the pump sequencing in order to more efficiently meet system demand Booster pumps with lower energy intensities used to meet a greater portion of the system demand Installation/integration of electrical sub meters for each of the identified pumps This metered data was incorporated into the control scheme and is being used to give another metrics variable in system operation Results Installed Measure Cost $128,000 Estimated Incentives: $54,925 Estimated Savings: $74,600/Year

22 Water - Boosters

23 Energy Efficiency Progress
With the completion of energy efficiency measures 1 and 2 the District has realized a decrease in ground water pumping costs from $245/Acre Foot (FY2015) to $190/Acre Foot (FY2017)

24 Innovation CVWD identifies areas capable of optimization and searches for methods to leverage resources to achieve a maximum benefit CVWD/SoCalREN partnership provided a method to leverage technology in a way which increased both efficiency and reliability CVWD provided resources contributing in the areas of design, installation, and integration of the controls.

25 Mission/Vision Provide high quality water while practicing good stewardship As good stewards CVWD is constantly looking for the highest value in projects. Value is rated with metrics including project cost, return on investment, and long term gains Through innovative processes, we were able to bring two groups of people together and develop projects which increased employee knowledge in the area of operations. This increased knowledge not only resulted in a successful high value project, but also increased the reliability of service.

26 Thank You Michael Maestas Water Production Manager
Cucamonga Valley Water District


Download ppt "Implementation of Progressive Energy Efficiency Projects with Local Electrical Utility and California Energy Commission Grant Funding AWWA Cal-Nevada AFC."

Similar presentations


Ads by Google