1 I-696 Improvements Cities of Warren, Centerline, Roseville April 2018-November 2018 Moving Macomb

2 Overview Project Limits Improvements Cost Anticipated Schedule
Maintenance of Traffic Overview

3 Why is this happening next year?
I-75 Mega Project Pavement Conditions Why is this happening next year? I-75 mega project from 13 mile to Coolidge and 8 Mile to 13 Mile have been expedited to late We don’t want 696 going on with the adjacent I-75 work. If we don’t do work on 696 next year, our next option is 2024 at the earliest.

4 Current Condition I-696 was constructed in the mid 70’s and it has been deteriorating over time. It’s gotten to the point where we can barely hold it together and a patch job wouldn’t suffice.

5 Current Condition So this is why the urgency to do mainline construction in 2018

6 I-696 from I-75 to I-94 Length 10 Miles
Project Limits

7 Improvements Mainline and Ramp Inlay Shoulder Repairs
Service Drive repairs (2019) Improvements Replace mainline and ramp pavement in kind.

8 Pavement selection Concrete is proposed
Public Act 79 (1997) Pavement analysis must be done when pavement costs exceed $1Mil Costs based on material prices and overall costs of the life cycle of the road *MDOT Pavement Design and Selection (2012) Pavement selection Components of the calculations are initial costs, maintenance costs, construction staging, and maintenance of traffic. The final calculation is equivalent uniform annual cost per lane mile per year. The lower material in price gets chosen.

9 Cost and Schedule Preliminary Budget of $87,800,000 for Construction
Construction is anticipated to begin April of through November 2019 (mainline completed in 2018) Open to Traffic November 2018 Cost and Schedule Mainline work completed in Service drives, ramps, and bridges to be completed in 2019

10 Maintenance of Traffic
Close WB I-696 traffic for the duration of mainline project construction April-November 2018 Maintenance of Traffic We looked at different options, closing one bound, part width construction, keeping traffic on one bound (both directions of traffic) and constructing in quadrants but we felt closing WB for the duration of the project was the most logical for traffic and constructability

11 WB I-696 Closed Maintain 3 lanes when EB is cross over to WB. Exits are proposed at Mound and M-97

12 Official Detour Freeway to freeway detour. I-94 to I-75 and back up to WB I People will use Metroparkway, M-59, 8 mile, the local mile roads.

13 Anticipated Milestone Dates
Plan Submittal: January 2018 Job Letting: March 2018 Construction Start: April 2018 Open to traffic: November 2018 Construction Completion: November 2019 Anticipated Milestone Dates

14 Communication Plan

15 Communication Plan Moving Macomb website (MovingMacomb.org)
Public Meeting (October 24th City of Warren 4-7 PM) Social Media (Twitter and Facebook) Engaging Stakeholders Distributing information to stakeholders Communication Plan Website will be updated by end of October

16 Questions or Comments Questions or Comments regarding the Project
Introduce team and take questions or comments