Download presentation
Presentation is loading. Please wait.
Published byAlexander Rice Modified over 6 years ago
1
Georgia DOT: Moving Forward with Safety on Our Minds
John L. Hibbard, P.E. Operations Division Director Georgia Department of Transportation ATSSA Annual Meeting September 21, 2017
2
Georgia DOT: On the Move
3
Transportation Funding Act of 2015
4
ASCE Report Card Grade: C Not Where We Need to Be!
5
Addressing Transportation Needs – Innovation and Collaboration
Innovative Delivery and Financing Focus on Connectivity for the Future Current and Future Regional Collaboration
6
Managed Lanes Vision 2018 2009 First Regional Managed Lane System Plan in U.S. 2014 Express Lanes Construction Begins 2015 Managed Lane Implementation Plan Transportation Funding Act 2016 MMIP Announced 2017 I-75 South Metro Express Lanes Open to Traffic
7
MMIP Program $11 Billion Program 11 projects under
contract by 2026 Uses Innovative Delivery and public-private partnerships to accelerate projects
8
MMIP Program MMIP Program
9
MMIP = Tangible Results
Source: Cambridge Systematics study for Georgia DOT, 2016
10
The Georgia Express Lanes System: Network Expansion
A connected network is planned for metro Atlanta, formed by projects currently open or under construction, MMIP and longer-range projects
11
Transit Partnership
12
Connected Autonomous Vehicles… The future is here
13
Focus on Safety: Off System Safety
14
Focus on Safety: Drive Alert Arrive Alive
15
Focus on Safety: CHAMP Coordinated Highway Assistance & Maintenance Program
16
Follow us @GeorgiaDOT @GADeptofTrans @gadeptoftrans
17
THANK YOU John L. Hibbard, P.E. Operations Division Director
Georgia Department of Transportation ATSSA Annual Meeting September 21, 2017
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.