Download presentation
Presentation is loading. Please wait.
1
2012 Line Information System Coca-Cola Refreshment
BASIC Training Coca-Cola Refreshment September 2012 We need information that is accessible, understandable, actionable and visible.
2
General Information Ground Rules: Target audience (Management):
Please put your Phones on mute (we have a large audience) We will not take questions during the training modules (a lot of material will be presented); however, at the end of each training module I will take questions for 5 minutes. Any additional questions can be sent to Bing Liu He will compile the questions and will send all the participants the Q&A. Target audience (Management): Plant Manager Production / Operation Manager – LIS Plant Champion Maintenance Manager Plant Control Specialist – LIS Plant Support SOEL The LIS Plant Champion will be in charge with the “LIS Tool Training “ for the Supervisors, Mechanics, Operators, etc. The LIS Management Routines Training will be provided by: Regional Productivity Team for LIS Plant Champion LIS Plant Champion for Plant Personnel
3
LIS Basic Training Modules: LIS Set up and Data Entry USLE Counts
Machines Maximum Speed, USLE Low and High Limit (for color coding) Shift Configuration Page Planned Downtime Data Entry Page Fill out the tables for: Downtime Reasons for Machines Centers / Equipment Q&A – 5 minutes USLE Definition USLE Today, By Hour, Yesterday, By Month, By Year and Historical Pages USLE Waterfall Page Counts Case Counts Today, Yesterday pages Cumulative Case Counts, Flavor Counts Page Cases and Packs Machines Centers Line Layout page and color code for the machines status Machine Center Efficiency, Average Maximum Speed, Down Time, MTBF, MTTR Machine Centers Status and Speed Trend Pages Machine Centers Historical Data Page
4
LIS Setup & Data Entry 1. Set up and Data Entry Overview Plant KPIs
5
Plant Configuration
6
Line Configuration USLE H&L Set up for Color Coding
7
Plant Configuration
8
Machines Speed Configuration
Setting up Filler Speed is critical for USLE, etc Setting up other Machines Max Speed is important for Speed V-Graph and Line Speed balance
9
Production Schedule Setup
10
Line Main Page
11
Supervisor Screen It is important for all the KPIs to set up correctly
the Line Schedule
12
Supervisor Screen
13
Supervisor Screen
14
Planned Downtime Page
15
Planned Downtime Entry
TBD Conveyors repairs, General maintenance It is “outside” cleaning: Conveyors Cleaning after Repairs The PB will reset automatically one minute after filler restart s It is important for OEE and Planned DT Statistics to hit the PB each time there is an event
16
QUESTIONS? Return
17
USLE Unconstrained System Line Efficiency (USLE)
A comparison of the actual number of cases produced during production line time, to the theoretical number of cases that could have been produced without any constraints (based on filler rated speed).
18
Line Main Page
19
USLE Today USLE Main Display
20
USLE Today
21
USLE By Hour Among the most Popular screens
22
USLE By Hour Among the most Popular screens
23
USLE by Hour Trend The Trend is for the Day, First, Second and
Third Shift
24
USLE Today
25
USLE Yesterday
26
USLE Today
27
USLE Historical Chose the interval and will display a table with
Per Day, Shift, First Hour And average USLE
28
USLE Today
29
USLE by Month USLE High and Low limits Number of Days and
Average USLE for month
30
USLE Today
31
USLE by Year
32
USLE Waterfall
33
USLE Waterfall TBD
34
QUESTIONS? Return
35
Counts
36
Counts Today Counts Main Display
37
Counts Today
38
Counts by Hour 1
39
Counts by Hour 1
40
Counts Cumulative by Hour
1 “Are we winning?” Cumulative Cases Produced vs Expected
41
Flavor Counts
42
Flavors Counter
43
Pack Counts
44
Pack Counts Pop-Up
45
QUESTIONS? Return
46
Machine Centers Machines Centers & Equipment Machine Centers
Machine Center: Filler, Packer, Palletizer, etc. Equipment: is defined as components of machine centers, for the Filler Machine Center the Equipment can be: Rinser, Capper, etc. Machine Centers Machine Efficiency = (Availability – Down Time) / Availability Availability = Machine is not in Lack and not on Backup (during Production Time) Down Time = Machine was stopped for internal reasons (something happened to the machine other than Lack or Backup) Minor Stops = Machine was stopped for Internal Reasons for < 10 Minutes Break Downs = Machine was stopped for Internal Reasons for => 10 Minutes Average Maximum Speed = Average Set up Speed for the machine MTBF = Mean Time Between Failures = Machine Running Time / Frequency Down MTTR = Mean Time to Repair = Machine Down Time / Frequency Down
47
Line Main Page
48
Line Layout Machine Status Color Code Machine KPIs
49
Line Layout
50
Filler Today Relevant KPIs Accepted by Industry Overview before
And after the Filler
51
Filler Today
52
Filler Speed Trend Adjust Trend Duration Will display: Real time speed
Average Max Speed Reason for Machine Stop
53
Filler Today
54
Filler Historical
55
Filler Today
56
Filler Status Machine was stopped Because of Motor Stop
57
Configure Downtime Reasons Page
58
Add Machines Downtime reasons
For Break Downs the selection of the Reason is a must Adding and removing Reasons is an easy process and will be done by plants
59
Add Machines Downtime reasons
60
Add Machines Downtime reasons
For Break Downs the selection of the Equipment is a must Adding and removing Equipment is an easy process and will be done by plants
61
Machine Status Page
62
Historical Machine Status
Filler is in back up and Filtec 1 is penalized Filler is in lack and Depal 1 is penalized
63
Line Main Page
64
Machines Speed – V Graph
Real Time Speed V - Graph
65
Machines Speed Configuration
Setting up Filler Speed is critical for USLE, etc Setting up other Machines Max Speed is important for Speed V-Graph and Line Speed balance
66
Machines Speed – V Graph
Real Time Speed V - Graph
67
The End QUESTIONS? Return
Similar presentations