Presentation is loading. Please wait.

Presentation is loading. Please wait.

2015 TB analysis.

Similar presentations


Presentation on theme: "2015 TB analysis."— Presentation transcript:

1 2015 TB analysis

2 Aim : have solid results before the next test beam
answers Beata : HV scan Veta : HV scan, saturation in longitudinal shower Itamar : telescope data,synchronisation Tasks : - tracking : telescope data (clustering, single track event,…) and data synchronisation - HV scan - Saturation : possibility to check the percentage of saturated event as a function of the depth in the shower (or number of W plane). - cross talk - Kapton tail length  - calibration - Charge collection (between pads, edges,..) moliere radius Aim : have solid results before the next test beam


Download ppt "2015 TB analysis."

Similar presentations


Ads by Google