Download presentation
Presentation is loading. Please wait.
1
2015 TB analysis
2
Aim : have solid results before the next test beam
answers Beata : HV scan Veta : HV scan, saturation in longitudinal shower Itamar : telescope data,synchronisation Tasks : - tracking : telescope data (clustering, single track event,…) and data synchronisation - HV scan - Saturation : possibility to check the percentage of saturated event as a function of the depth in the shower (or number of W plane). - cross talk - Kapton tail length - calibration - Charge collection (between pads, edges,..) moliere radius Aim : have solid results before the next test beam
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.