Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG Editor’s Meeting (Nov ‘10)

Similar presentations


Presentation on theme: "WG Editor’s Meeting (Nov ‘10)"— Presentation transcript:

1 802.11 WG Editor’s Meeting (Nov ‘10)
July 2007 Nov 2010 WG Editor’s Meeting (Nov ‘10) Date: Authors: Peter Ecclesine (Cisco Systems) Peter Ecclesine (Cisco Systems)

2 Volunteer Editor Contacts
Nov 2010 July 2007 Volunteer Editor Contacts TGs – Kazuyuki Sakoda - TGu – Necati Canpolat – TGv – Emily Qi – TGmb – Adrian Stephens – TGaa – Alex Ashley – TGad – Carlos Cordeiro – TGae – Henry Ptasinski – TGaf – Peter Ecclesine – Editors Emeritus: TGk – Joe Kwak– TGn – Adrian Stephens – TGp – Wayne Fisher – TGr – Bill Marshall – TGw – Nancy Cam-Winget – TGy – Peter Ecclesine – TGz – Menzo Wentink – Peter Ecclesine (Cisco Systems) Peter Ecclesine (Cisco Systems)

3 Nov 2010 July 2007 ANA Announcements Current ANA announced to group is r14. (11/2/2010) See All new requests received by end of meeting will be uploaded and announced via WG reflector Procedure for ANA is contained in 07/0827r0. See Editorial Guidance ANA assignments should be done before the time of moving from WG LB to Sponsor ballot. If a resource number is not in the ANA Database, please use <ANA> in drafts! Editors to replace any ANA controlled resources numbers with <ANA> upon incorporation of material into drafts. ANA will control SMT, Groups, could use TG-specific numbering until going to Sponsor Ballot Peter Ecclesine (Cisco Systems) Peter Ecclesine (Cisco Systems)

4 ANA Report Since September 17th, ANA reported changes on October 27th.
Nov 2010 ANA Report Since September 17th, ANA reported changes on October 27th. As ANA,  I need to bring a matter to discussion and decision during the November session. I may raise this in the editor’s meeting, and then in the Wednesday plenary. For details please see: Peter Ecclesine (Cisco Systems)

5 Numbering Alignment Process
Nov 2010 Numbering Alignment Process Update from all published standards. Posted as 11-08/644r19 (11/1/2010) By Bill Marshall TGz D12 started a new update cycle. 11v D16, 11u D13, numbering needs to be completed. 11s D8 is the next, then 11ae, 11af, 11aa, 11ad, 11ac, 11ah. Create a working group MEC that includes numbering and ANA before going to Sponsor Ballot We use more columns for the two baselines. Slide 5 Peter Ecclesine (Cisco Systems)

6 Editor Amendment Ordering
July 2007 Nov 2010 Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers! Editor Amendment Ordering Data as of November 2010 See Amendment Number Task Group REVCOM Date Amendment 8 TGv Dec 2010 Amendment 9 TGu Revision 802.11mb Dec 2011 Amendment 1 TGs June 2011 Amendment 2 TGae Mar 2012 Amendment 3 TGaf Amendment 4 TGaa Amendment 5 TGad Dec 2012 Amendment 6 TGac Amendment 7 TGah July 2013 Peter Ecclesine (Cisco Systems) Peter Ecclesine (Cisco Systems)

7 Draft Development Snapshot
July 2009 July 2007 Nov 2010 Draft Development Snapshot Most current doc shaded green. Changes from last report shown in red. TG Published or Draft Baseline Documents Source MEC Style Guide Editor Snapshot Date Published p z v u mb s ae af aa ad ac Y 2010 Frame 7.2 Yes 2009 Menzo Wentink 10-Nov 16.0 Emily Qi 13.0 Frame 9 Necati Canpolat 11-Nov 6.0 Adrian Stephens 9-Nov 11.0 10.0 4.0 7.02 Frame 8.0 Kazuyuki Sakoda 7.0 1.0 Word No OpenOffice 3.2 Henry Ptasinski 15.0 12.0 0.06 Frame 7.1 Peter Ecclesine 10-Oct 14.0 4.01 0.02 0.05 Alex Ashley 9.0 5.0 0.1 Carlos Cordeiro 14-July ah Slide 7 Peter Ecclesine (Cisco Systems) Page 7 Peter Ecclesine (Cisco Systems)

8 802.11 Style Guide See 11-09-1034-00-0000-wg11-style-guide.doc
Peter Ecclesine (Cisco Systems)


Download ppt "WG Editor’s Meeting (Nov ‘10)"

Similar presentations


Ads by Google