RSC FY18 Capital Items (funded by IMA)
Request Location Cost Lindquist and ADA compliant Door project - additional funds needed Lindquist/other replacement $63,500 HS Boys locker room lavatory waste line HS replace/repair $16,000 EMS software upgrade and controller replacements Campus-wide replace/upgrade $135,000 Tennis Court repair Grounds repair $13,000 VCT Replacement - multiple areas multiple $48,000 MS IT Head end A/C units MS $25,000 Concrete repairs (handicap ramps/cafeteria dumpster pad) $18,000 Anoxic Tank Mixers - WWTF WWTF replace $10,700 MS Variable Frequency Drive (VFD) Upgrade SyncroFlo system $12,000 Exhaust / Ventilation - MS and HS MS/HS replace / repair $23,500 TOTAL $364,700