1 The Republic of the Union of Myanmar Ministry of Electric Power
Electricity Supply Enterprise Tanintharyi Region Office Priorities and Detailed Description of Electrification Plan For Tanintharyi Region Dated -21.Oct.2015

2 AS Per DE Idea after discussion with Local Goverment
Current price of electric power(Tariff) in Tanintharyi Region is between (300 ~ 650) kyats and want to be the same rate with other states and regions is the main desire. By the high rise Tariff the Local SME can’t done their works and less opportunity for getting Jobs and people of the region have to go neighbouring countries. These are main Losses Local ( regional ) Labour power. Construction Works of 11 kV Line (68.5) mile 11/0.4 kV Sub-station(17) Nos are Completed and by the Budjet of Regional Government . Now Continue 400V Line Works to Villages Between Two Miles by the Budjet of Regional Government .

3 AS Per DE Idea after discussion with Local Goverment
To Construct 33kV Lines and 33/11kv Sub-station every Township and all District. Procurenemt of National Grid to Tanintharyi Regionals is needed. 33/11 kV (5MVA ) Sub- station now underconstruction and Thayetchaung and loung Lon Towns by the JICA (ODA Loan) Project and Dawei District. 66/ 33kV (20MVA) Sub- station extension work have to be done and 66/11kV (15MVA) Dawei Sub-Station to supply above Sub- Station construction of 33kV switch bay ( 4) Nos is also needed for distribution including Yephyu Township and Myitta. For the system improvement of distribution area extension up to the villages and Dawei district 33kV Line and Sub- station construction work have to be continue.

4 (Within 2 miles from Existing 11 kV Distribution Line)
Completed Construction Work for Villages Tanintharyi Division (Within 2 miles from Existing 11 kV Distribution Line) No District Township House To be Constructed Total Name of Village 11KV 400V 11/0.4kV Estimated To be Electrified Hold Line TR Cost (miles) kVA  (Mil Kyats) 1 Dawei Kathan 132 0.5 100 64.3 2 Thapyar 114 1.8 96.5 3 Taung post 74 79.5 320 4.3 300 240.3 Thayetchaung Kyar Inn 263 0.75 200 68.8 Ahtwin Kaze 70 1.5 80 Kyawe zeik 329 1.7 73.8 4 Sin Kayn 195 91.3 875 6.2 2.75 800 313.9 Ye Phyu Pale Gu 96 79 Thapay Son 104 69.8 Min Dat 62 49.8 Pagaw Son 285 70.3 5 Yan Gin 22 6 ‌Kyauk Dauk 198 102 7 Megaung Long 99 101 8 Zinber 252 0.7 61 1118 7.7 6.25 1000 582.7 ,No. of Village To be Electrified By Local Government budgets(20 No.) ,No. of Village To be Electrified By JICA ODA Loan (6 No.) ,No. of Village To be Electrified By Local Government budgets(17 No.)

5 Completed Construction Work for Villages Tanintharyi Division
(Within 2 miles from Existing 11 kV Distribution Line) No District Township House To be Constructed Total Name of Village 11KV 400V 11/0.4kV Estimated To be Electrified Hold Line TR Cost (miles) kVA Dawei 4 ‌Long Lon 1 Ngapidat Inn 268 0.7 1.5 200 94.3 2 Inn Wonn 101 0.75 100 62.1 3 The pon 107 67.8 Kayin Gyi 216 79.5 5 Sinpa N 120 1.3 74.5 6 Nyin Maw 260 102 7 Pyin Htain 202 8 Got Inn 431 - 78.5 9 Ye Phyu 552 78.35 10 Kyauk Phyu 80 45.3 11 Gadat Gyi 262 12 Pyin Chaung 114 56 13 Kyeik Yet Twinn 460 14 Than Nyhin 62 0.5 34.5 15 Han Gyo Taw 110 46.3 16 Tha Phay Chaung 204 3549 7.75 16.75 2700 Total District 31 5844 25.95 27.75 4800

6 Completed Construction Work for Villages Tanintharyi Division
(Within 2 miles from Existing 11 kV Distribution Line) No District Township House To be Constructed Total Name of Village 11KV 400V 11/0.4 kV Estimated To be Electrified Hold Line TR Cost (miles) kVA 2 Myeik 5 1 Kyauk PhyuTaung 198 0.2 0.5 160 40 Kyawegu Yadana 260 79.5 3 KyaweguThuwana 170 - 57 4 KyaweguPalethawe 168 Chanmyae Tharyi 276 61.5 6 Ywa Thit 233 1305 3.4 5.5 960 397 Palaw Magyi Gone 205 80.5 7 Palauk (4)Quarter 391 200 58 8 Kyunsu Kan Gyi 223 1.5 90.8 Ma Yan Chaung 278 501 320 181.6 Total District 10 2402 9.4 8.5 1640 717.1 ‌Kawthaung 9 Kawthaung (9)Miles 150 100 78.5 (10)Miles 298 100.5 448 2.5 300 179 Grand Total 43 8694 37.35 38.75 6740 ,No. of Village To be Electrified By Local Government budgets(20 No.) ,No. of Village To be Electrified By JICA ODA Loan (6 No.) ,No. of Village To be Electrified By Local Government budgets(17 No.)

7 Completed Construction Work for Villages Tanintharyi Division
(Within 2 miles from Existing 11 kV Distribution Line) 1

8 Completed Construction Work for Villages Tanintharyi Division
(Within 2 miles from Existing 11 kV Distribution Line) Kalainaung Ye Phyu Dawei Myint Tar Long Lon Thayet Chaung

9 Completed Construction Work for Villages Tanintharyi Division
(Within 2 miles from Existing 11 kV Distribution Line) Palauk Palaw Myeik Kyunsu Tanintharyi

10 Completed Construction Work for Villages Tanintharyi Division
(Within 2 miles from Existing 11 kV Distribution Line) Pyi Gyi Mandine Boke Pyin Kaya Thuri Khamaunt Gyi Kawthaung

11 Completed Construction Work for Villages Tanintharyi Division
( Year By Local Government Budgets) No Distisc Township To be Constructed Estimated  Remark Name of Village 11KV 400V 11/0.4kV Cost To be Electrified Line TR (Mil (Miles) kVA  Kyats) 1 Dawei Pagaryi 7.4 0.5 200 2 Kathan 0.3 100 17.395 3 Taung Post 4 Thaphyar 23.144 5 Mel Chaung 0.27 17.147 6 Pa Khat 2.3 Total 9.7 2.37 800 Long Lon Tharyar Gone 24.263 Theinle Ywahaung Wa Mel Maw 1.1 52.211 Pandale 24.256 Pyinsathi Maw 7 Khone Zayak 8 Tha Phyar 9 Waidi 3.8 1. 0 138.7 10 ‌Taung MinPyoung 0.75 46.456 11 Htein Twin 56.942 12 Sakain Gyi 46.774 13 Me Ohn Naung

12 Completed Construction Work for Villages Tanintharyi Division
( Year By Local Government Budgets) No Distisc Township To be Constructed Estimated  Remark Name of Village 11KV 400V Line (Miles) 11/0.4kV Cost To be Electrified TR (Mil kVA  Kyats) Dawei Long Lon 14 Khamaung Taung 0.75 160 1 35.702 15 Nyin Maw 0.4 200 16 Yin Boke 100 17 Kaw Ann 18 Aouh Yephyu 19 Kyauk Phyu 0.5 20 Kadak Gyi 21 Pyin Chaung 22 Hincho Taw 23 Kaaukyek Twin 24 Tha phay Shaung 25 Thabot Seik 1.25 55.367 26 Pyin Gyi 0.6 41.494 27 Taw Shae 24.258 Total 9.25 13.85 2500 28 3 Thayet Sin Gu 0.45 36.019  Chaung 2 Kyar Inn 1.6 40.872 Ah Twin Kaze 1.189 50 35.858 4 Kyatsar Pyin 1.4 37.138 4.689 570

13 Completed Construction Work for Villages Tanintharyi Division
( Year By Local Government Budgets) No Distisc Township To be Constructed Estimated  Remark Name of Village 11KV 400V Line (Miles) 11/0.4kV Cost To be Electrified TR (Mil kVA  Kyats) 1 Dawei 4 Ye Phyu Ze Gya 0.5 200 28.605 2 ‌Kyauk Kanyar Total 1. 0 400 5 Kalan Aung Kanbouk 0.4 20.997 Me GaungLong 47.766 0.9 68.763 Myeik 6 Palaw Palaw Gone 7 2.5 Waktoe 100 28.053 3 Mawme 35.315 Gingar Taung Pale Pala 10. 0 3. 0 Magyi Gone 2. 0 66.691 8 Min Htein 42.802 9 Pawut Gone 42.804 10 Kadel 68.885 11 Thingan Taw 27.023 12 Tinn Shane 49.426 13 To 70.24 14 Lagu 15 Maw Kyaung 34.825 ‌Total 21. 0 11. 0 2000 18 Grand Total 54 45.639 29.57 6670 60

14 Completed Construction Work for Villages Tanintharyi Division
( Year By JICA ODA Loan Budgets) No Distisc Township To be Constructed Remark Name of Village House 11KV 400V Line (Miles) 11/0.4kV To be Electrified Hold TR kVA 1 Dawei Pulu Gone 42 - 0.5 200 2 Zahyar 440 1. 0 3 Maungme Shaung 503 Total 985 2.5 600 Long Lon (B) Quarter 220 (C) Quarter 280 Ann Zauk 737 4 Manyauk 700 5 Long Lon To 12 Thaphay Shaung 6 Maung Ma Gun 1248 3185 3. 0 400 Ye Phyu (A)Quarter 130 0.3 0.7 (D) Quarter 233 Nyin Htwe 330 0.6 693 2. 0 Thayet Sin Ku 139 1.5  Chaung Sin Phyu Pyin 210 0.75 Oak tu 430 779 5.5

15 Completed Construction Work for Villages Tanintharyi Division
( Year By JICA ODA Loan Budgets) No Distisc Township To be Constructed Remark Name of Village House 11KV 400V Line (Miles) 11/0.4kV To be Electrified Hold TR kVA 2 Myeik 1 InTown 23199 3. 0 5. 0 200 7 Khawegu 1179 Shawe Du 244 2.5 1. 0 3 Thara Me 130 4 Dala Shaung 73 2. 0 0.5 5 Panel Taung 211 6 Ann Ga Maw 372 1.5 Kan Tharyar 177 8 Maw Taung 72 0. 5 9 Ka Lin Pann 142 10 Kinsoe 149 11 Taung Pale 145 12 Pa Thaung 449 ‌Total 26542 25 18 4000 20 Grand Total 26 32184 43.1 27 6000 30

16 The additional electrification statement due to newly and upgrading
66/33/11kV substation and related power Line for Tanintharyi Region Serial Township To be Constructed The effective area Estimated Cost ( Mil Kyates ) Substatio n 66kV Line (mile) 33kV Total Villages House Hold Popu lation Materials Cost Installa Tion 1 Dawei Extension 66/33kV, 20MVA With 33KV Switch Bay (3)Nos. - 54 14524 72657 255.50 2 Myit Tar 33/11kV 5 MVA 30 Miles 10 1908 13277 250.23 64 16432 85934 505.73

17 Location Map of Proposed 66/33KV Sus-Station (1)No
Location Map of Proposed 66/33KV Sus-Station (1)No. 33/11KV Sus-Station(1)No.& 33KV Line(30)miles Effective Villages No. of Villages No. No. of Household Estimate Cost mil Kyats Kan Bouk Gas Power Station (1MWx6Nos-6MW) Effective Villages No. of Villages No. No. of Household Estimate Cost mil Kyats Dawei Legend 66/11KV Sus-Station(Existing) 66/33KV,20MVA Sus- Station(Proposal) 33/11KV Sus-Station(JICA ODA Loan) (Loung Lon & Thayet Chaung) 33/11KV ,5MVA Sus- Station(Proposal) (Myit Ta) 66KV Line(Existing) 33KV Line(JICA ODA Loan) 33KV Line – 30Miles(Proposal) Myit Tar Loung Lon Thayet Chaung

18 Location Map of Proposed 66/33 KV Sus-Station (1)No
Location Map of Proposed 66/33 KV Sus-Station (1)No. 33/11 KV Sus-Station(1)No. & 33 KV Line 30 miles Legend 66/11KV Sus-Station(Existing) 66/33KV,20MVA Sus- Station(Proposal) 33/11KV Sus-Station(JICA ODA Loan) (Loung Lon & Thayet Chaung) 33/11KV ,5MVA Sus- Station(Proposal) (Myint Ta) 66KV Line(Existing) 33KV Line(JICA ODA Loan) 33KV Line – 30Miles(Proposal) Effective Villages No. of Villages No. No. of Household Estimate Cost mil Kyats No. of Villages No. No. of Household Estimate Cost mil Kyats Kan Bauk Dawei Loung Lon Thayet Chaung Myit Tar

19 Effective Villages from Loung Lon 33/11KV (5MVA) Sus- Station
No Townsghip Name of To be Constructed Remark Village House Popu 11/0.4 Tr 400V Estimated District To be of hold lation 11KV (Line) Cost Electrified Line kVA (Mile) (Mil Kyats)  1 Dawei Loung Lon 1 Nyinmaw 260 1170 - 200 0.4 21.347 2 Yinnbod 80 82 400 100 3 Godinn 392 395 1646 21.348 4 Yaphyu 540 542 2160 5 Kyaukphyu 83 85 356 0.5 21.980 6 Kadakyi 258 1290 21.870 7 Pyinchaung 115 118 506 8 Kyetyetwinn 445 446 1780 9 Hinnchotal 108 109 454 10 Thapyshaung 203 840 11 Inwinn 102 103 438 50.000 12 Pyinthane 201 202 804 160 63.000 13 Painshaung 121 123 508 0.75 74.000 14 Citpyae 427 429 1708 15 laythawkhan 182 183 691 16 Kadaungni 101 105 434 92.000 17 Kanyunkyun 318 319 1335 3.8 1.5 18 Ti zit 860 3.5 19 Kadangehtein 225 227 967 78.000 20 Naungton 156 159 639

20 Effective Villages from Loung Lon 33/11KV (5MVA) Sus- Station
No Township Name of To be Constructed Remark Village House Popu 11/0.4 Tr 400V Estimated District To be of hold lation 11KV (Line) Cost Electrified kVA (Mile) (Mil Kyats) Dawei Laung Lon 21 Wettherkin 103 105 433 1 100 0.75 73.000 22 Thepone 108 420 160 0.5 63.500 23 Mainmachaw 104 106 436 200 74.500 24 Thanlyin 73 75 306 64.000 25 Panyit 92 94 368 5 26 Sanlann 323 328 1356 3.8 Total 26 Village 5314 6368 22305 28.6 3940 28 14.35 year by local government Budg ets year proposal by local government Budgets

21 Effective Villages from Thayet Chaung 33/11KV (5MVA) Sus- Station
No Townsghip Name of To be Constructed Remark Village House Popu 11/0.4 Tr 400V Estimated District To be of hold lation 11KV Cost Electrified Line kVA (Mil Kyats) (Mile)  1 Dawei Thayatchung 1 Atwinkazee 95 96 513 0.85 34.00 Proposal to be 2 Kazee 118 200 730 Constracted for 3 Paintalk 499 510 3697 40.00 year by 4 Pachaishaung 231 243 1550 80.00 Local Gevernment 5 Panpyan 143 146 957 6 Mennalohel 75 76 430 7 Thayetnakha 436 3010 0.75 160 77.00 8 Thinkunn 521 4100 9 yantaung 516 524 3563 0.5 110.00 10 Nyainzin 1010 1018 6577 11 Kyarinn 313 315 3100 120.00 12 Kyatsarpyin 113 613 13 Titotpyin 410 418 2349 14 Eainshaepyin 210 220 1222 15 Shinphyupyin 238 1500 16 Sawfyar 305 307 1950 6.5 100 292.00 17 kinnshae 213 215 1671 70.00 18 Moeshweju 103 106 533 19 Chaukchaung 317 610 391.00 20 Sinjyun 309

22 Effective Villages from Thayet Chaung 33/11KV (5MVA) Sus- Station
No Townsghip Name of To be Constructed Remark Village House Popu 11/0.4 Tr 400V Estimated District To be of hold lation 11KV (Line) Cost Electrified kVA (Mile) (Mil Kyats)  1 Dawei Thayatchung 21 Kyanzett 420 423 2500 0.5 200 2 126.00 Proposal to be 22 Petan 165 801 1.5 160 1 97.00 Constracted for 23 Laba 115 128 613 69.00 year by 24 Pyanphyugyi 213 220 2100 0.75 77.00 Local Gevernment 25 Boatkaul 100 113 535 26 Outto 443 449 3313 2.5 142.00 27 Zinkuu 150 161 995 - 82.00 28 Thayetaung 121 610 Total (28) Village 7877 8156 50352 31 2780 18 35.6

23 Effective Villages from Myit Tar 33/11KV (5MVA) Sus- Station
No Townsghip Name of To be Constructed Remark Village House Popu 11/0.4 Tr Estimated District To be of hold lation 11KV 400V Cost Electrified (Line) kVA (Mil Kyats) (Mile)  1 Dawei Myittar 1 On the City 346 2610 - 200 3 0.5 67.00 Proposal to be 2 Taungthonelone 278 1860 7 312.00 Constracted for Shwe Chaung 50 340 100 35.00 year by 4 Heinn Dar 613 4151 3.5 231.00 Local Gevernment 5 Myaung Pyo 84 577 6 Kalitt gyi 33 252 49.00 Nyung Thone 110 792 335.00 8 Kyaut Maee toung 124 836 9 Myinn Thar Daw 81 566 10 Kye Thar Inn 130 886 11 Tha Puee Chaung 59 407 Total (10 )Village 1908 13277 17 1900 14 6.5

24 Electrified Connection
The Statement of Fiscal Yearly Budget and Electrified Connection for Tanintharyi Region No Fiscal Year State/Region Capital Budget for ESE (mil Kyats) Capital Budget for DRD (mil Kyats) Electrified Connection ON Grid Off Grid Total Cost For 11 kV Line & 11/0.4 TR for 400 V Line Total Village (Nos) Consumer 1 Estimate (RE+BE) 0.47 0.04 0.51 - 91 7747 2 Estimate (RE+BE) 1846 946 2792 889.77 130 12731 3 Budget (RE+BE) 13047 6549 19596 360 41367 Grand Total 581 61845