Download presentation
Presentation is loading. Please wait.
Published byChad Mitchell Modified over 6 years ago
1
St. Mina and St. Abanoub Coptic Orthodox Church 4/5/2009
A Facility Vision for St. Mina and St. Abanoub Coptic Orthodox Church 4/5/2009
2
Bruns General Contracting
Quality Family Owned Business Celebrating 55 Years Third Generation Experienced in Church Construction 5 Year Warranty Bruns Team Don Highlander, Architect Kim Carter, Marketing Danny Griffith, Stewardship
3
Potential Schedule From when you say go…
Finish drawings/Permits 3 months Mobilization month Site grading/Foundation 1 month Shell months Mechanical/Electrical/Plumbing 2 months Interior Finish 2 months
4
Site Plan
5
Option A - Lower Level Floor Plan
11,336 SF Social Hall – 10 SF/Person 5
6
Option A - Upper Level Floor Plan
Worship Capacity: , 18 Platform, 35 overflow 6
7
Option B - Lower Level Floor Plan
10,112 SF Social Hall – 10 SF/Person 7
8
Option B - Upper Level Floor Plan
Worship Capacity: 310 – 264, 18 Platform, 28 overflow 8
9
Interior 9
10
Perspective View from South-west corner 10
11
A Division of Bruns General Contracting, Inc.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.