Presentation is loading. Please wait.

Presentation is loading. Please wait.

Testbed 7) Wheel Assembly 6) Battery Strap 8) Clawbot 5) Limit Switch

Similar presentations


Presentation on theme: "Testbed 7) Wheel Assembly 6) Battery Strap 8) Clawbot 5) Limit Switch"— Presentation transcript:

1 Testbed 7) Wheel Assembly 6) Battery Strap 8) Clawbot 5) Limit Switch
Build the testbed in this order. If you prefer to collect your parts before you start to build there is a video on Canvas to assist with this (optional). Cortex Potentiometer. Attach with 2 screws/nuts (hidden in picture) Bumper Switch Line Tracking Sensor Limit Switch Battery Strap (don’t insert Battery yet) Wheel Assembly. 4 videos on Canvas to assist. Use the gold screws as the skinny screws in this step. Notice from the picture that only 2 black plastic bearings are needed, not the 3 shown in the video. Clawbot. See pic on back for proper placement. Connect wires to Cortex. See back of this page for assistance. The 2 wheel motors need to have a Motor Controller cord attached to them before attaching to the Cortex. Notice the Green LED- insert this, as well. Testbed 7) Wheel Assembly 6) Battery Strap 8) Clawbot 5) Limit Switch Cortex 2) Potentiometer 3) Bumper Switch 4) Line Follower

2 Testbed Wiring Guide Clawbot attached. Your claw may be parallel to the ground (not at an angle like this one).


Download ppt "Testbed 7) Wheel Assembly 6) Battery Strap 8) Clawbot 5) Limit Switch"

Similar presentations


Ads by Google