Design of Wastewater Collection Network for Teeba

Similar presentations


Presentation on theme: "Design of Wastewater Collection Network for Teeba"— Presentation transcript:

1 Design of Wastewater Collection Network for Teeba
Prepared by Supervisor Dr. Mohammad N. Almasri Fall/Spring 2016 Dania A. Hasiba Tharaa I. Alawneh

2 Conclusions & Recommendations
Outline Introduction Study Area Methodology Results Objectives Cost Conclusions & Recommendations SewerCAD

3 Introduction

4 Objectives Potential cost estimation wastewater collection
Design of wastewater collection net work for Teeba area Potential cost estimation Potential cost

5 Study Area Location Water Resources Topography Study Area Land use
F Topography Study Area B C E Land use Soil type D D Climate

6

7

8

9 Prepare Design Profiles
Methodology Determine Cost of WWCN Prepare Design Profiles Design WWCN SewerCAD Data collection Select Study Area Define the Problem

10 Data Collection Site visit. Contour map
AutoCAD and GIS data for the study area.

11 Network Plan

12 Load Estimation

13 Water Consumption (L/day)
Load Estimation Total load= MH. Load of WW generation + MH. Load of Infiltration For MH-10: Total load = (4*1*2*1*5*120*0.8*4)+ (0.05*4*1*2*1*5*120*0.8*4) = L/day MH-10 4 # of Parcels 120 Water Consumption (L/day) 80 WW Generation (%) MHF 5 Infiltration (%)

14 Input Data to SewarCAD Constraints :

15 Results

16 Results

17 Results

18 Results

19 Results

20 Results

21 Results

22 Cost Total Cost Sewers Manholes Paving

23 Cost Excavation Cost (pipes) : Cost ($) Depth(m) 35 0-1.5 45 1.5-2 50
2-2.5 60 2.5-3 65 3-3.5 90 3.5-4 4-4.5 100 >4.5

24 Cost Excavation Cost (Manholes) : Cost($) Depth(m) 750 0-1.5 900 1.5-2
1000 2-2.5 1800 2.5-3 2000 3-3.5 3100 3.5-4 3800 4-4.5 4600 >4.5

25 Cost Total Cost Total Cost =289681 $ Sewers Manholes Paving
= $/Km

26 Conclusions # of manholes, conduits, outfalls Pipes size.
Slopes, velocity, cover depth of conduits. Total Flow to outfalls Total cost

27 Recommendations Main sewer line downstream from the outfalls.
Wastewater Treatment Plant (WWTP).

28 Thank you  We did it  Design Working hard