Presentation is loading. Please wait.

Presentation is loading. Please wait.

Traffic Control Plan Development Course

Similar presentations


Presentation on theme: "Traffic Control Plan Development Course"— Presentation transcript:

1 Traffic Control Plan Development Course
Module 5 Work Zone Plan Sets

2 Work Zone Plan Sets Some of the sheets found on a TTC plan include, but are not limited to: Title Sheet For Overall Plan For TC Section Pay Item Tabulation Sheet Traffic Control Tabulation Sheet Special Signs Narrative Advanced Signing Detours Traffic Control Staging Sheets (Layout Sheets) Typical Sheets

3 TC Plan Development General Information
Designers must be aware of the need for a Traffic Control Plan Coordination meetings are recommended Designer will likely need to provide construction sheets or general layout sheets Traffic Engineering will develop based on: TEM MN MUTCD TMP

4 Standard Plates Website
TC Plan Development Standard Plates Approved by Department staff and Federal Highway Administration for the various structures essential to highway design and construction Used by manufacturing firms in supplying products of culverts, sewers, erosion controls, signals, lights, guardrails, fences, etc Standard Plates Website

5 Plan Assembly Steps To begin the project, start with ProjectWise
Obtain the existing construction plans, including any staging Eliminate levels of detail (buildings, lot lines, etc) on roadway plan sheets REASON: So placement of signs on roadway sheets are not cluttered by underlying details.

6 Plan Assembly Steps To begin the project, start with ProjectWise
Obtain the existing construction plans, including any staging Eliminate levels of detail (buildings, lot lines, etc) on roadway plan sheets REASON: So placement of signs on roadway sheets are not cluttered by underlying details.

7 TTC Assembly Steps Organize roadway plan sheets
all mainline roadway comes first with stationing generally increasing from left to right (include roadway through interchanges for depicting mainline TC through the interchange next are interchange/intersection layouts for indicating TC on cross streets and at ramp terminals REASON: Consistency in design.

8 TTC Assembly Steps Place traffic control elements on the roadway plan sheets for each direction of travel Refer to the discussions in Chapter 3 (Devices and Materials) and Chapter 4 (Work Zone Applications)

9 TTC Assembly Steps Label each type of pavement marking with the following numbering system: REASON: The uniqueness of each pavement marking material is bid differently by contractors

10 TTC Assembly Steps For a detour plan, a circled note below the sign on the layout sheet indicates the action to take with the sign Typical notes show include:

11 TTC Assembly Steps Prepare list of standard plates applicable to project Prepare list of estimated quantities using the total quantity from each of the data boxes Assemble all necessary typical sheets Complete the title sheet Assemble ALL of the plan sheets in the proper order Number the roadway sheets sequentially beginning with the Title Sheet as Sheet TC1 Fill in, and check, all sheet cross referencing throughout the plan

12 TTC Assembly Steps ASSHTOWare

13 Metro District TTC Plan Checklist

14 Metro District TTC Plan Checklist

15 Metro District TTC Plan Checklist

16 Metro District TTC Plan Checklist

17 Metro District TTC Plan Checklist

18 Metro District TTC Plan Checklist

19 Metro District TTC Plan Checklist

20 Metro District TTC Plan Checklist

21 Metro District TTC Plan Checklist

22 Metro District TTC Plan Checklist

23 Metro District TTC Plan Checklist

24 Metro District TTC Plan Checklist

25 Process A vs Process B Process A projects
small projects, which are minor in scope Contain no more than 50 plan sheets and comprise less than 20 pay items MAY be 8 ½ x 11 inch sheets If process A, coordinate with the main plan designers on what they are doing

26 Process A vs Process B Process B projects
Consists of plans that needs Central Office approval Typical projects constitute approximately 75% - 80% of the current Pre-Letting workload The typical project may require special provisions prepared by the District specialty units Typical project will require utility coordination, and possible agreements

27 Common TTC Plan Set Issues
Discussed Later

28 Design Scene A guidance document for designers, technicians and engineers to help improve the quality and reduce cost and time of plan preparation An example of the Design Scene newsletter, and some select Design Scene topics are included as a handout in the Appendix

29 Construction Plan Title Sheet
Plan Description and Location

30 Construction Plan Title Sheet
Project Number(s) Construction Plan Title Sheet

31 Construction Plan Title Sheet
Governing Specifications and Index of Sheets

32 Construction Plan Title Sheet
Plan Preparation Certification Note

33 Construction Plan Title Sheet
Project Numbers and Sheet Numbers

34 Construction Plan Title Sheet
Signature Block

35 Construction Plan Title Sheet
Index Map

36 Construction Plan Title Sheet
Project Location

37 Construction Plan Title Sheet
Plan Revisions Block

38 TTC Plan Title Sheet Traffic Control Plan Title Sheet

39 TTC Plan Title Sheet General Information

40 TTC Plan Title Sheet Signing Notes

41 TTC Plan Title Sheet Pavement Markings

42 TTC Plan Title Sheet Barriers and Delineation

43 TTC Plan Title Sheet Construction Information Signing

44 TTC Plan Title Sheet TTC Plan Index

45 TTC Plan Title Sheet Traffic Control Devices and Symbols Legend

46 TTC Plan Title Sheet Striping Legend Key

47 TTC Plan Title Sheet Title, Signature, Project Number and Sheet Number Block

48 Traffic Control Tabulation
AASHTOWare Project List

49 Traffic Control Tabulation
Traffic Control Supervisor A pay item that can have three different units (Hour, Each, Lump Sum) used when you have complex traffic control or a switch If you use lump sum, technically this person is needed at all times Using ‘Hour’ is more flexible

50 Traffic Control Tabulation Charts Sheet

51 Special Sign Details

52 Narrative Sheet

53 Advanced Signing

54 Detour Sheeting

55 TC Layout Sheets

56 TC Layout Sheets

57 TC Layout Sheets

58 TC Layout Sheets

59 TC Layout Sheets

60 TC Layout Sheets Layout Sheet Tips
On the Layout sheets, all the extra elements are not needed (like parking lots) Don’t be afraid to us insets If possible, can break in half and show two sheets on one

61 TC Layout Sheets Layout Sheet Tips
Avoid having sheets with limited information on it For instance, Advanced Signing may be the only thing on a sheet (if break lines are not used) This helps to remove unnecessary sheets that just show one sign A distance isn’t needed since it can be found in other references already stated in this material

62 TC Layout Sheets Layout Sheet Tips
If the “Right Lane Must Exit” is permanent, this should be noted such Not all signs need to be shown, just the ones that are impacted by the TC plan If a sign is being covered, that should be noted If anything is in-place and relative to the installation, show it. An example such as Adopt a Highway would not be shown

63 TC Layout Sheets Layout Sheet Tips
Use match-lines or break-lines when possible or feasible Dimensions instead of a scale can be used When you have sheets that have redundant info, such as pavement marking, don’t need to show every single pavement marking. Include typicals and break lines in-between

64 TC Layout Sheets Layout Sheet Tips
As a test, printout sheets and look at them on paper Do this early and make sure it is readable on paper, not just the screen If there is a cross street, show the name of the cross street to give a reference point

65 TC Layout Sheets Layout Sheet Tips
If TL2 and TL3 attenuators are being used, need to call these out on the plan If only one type is being used on the full plan, do not need to call these out See Design Scene

66 Typical Drawings

67 TC Layout Sheets

68 TC Layout Sheets

69 Common TTC Plan Set Issues
The following is a list of some of the common issues with TTC plan sets from MnDOT reviewers These are not in any order of importance

70 Common TTC Plan Set Issues

71 Common TTC Plan Set Issues

72 Common TTC Plan Set Issues