Download presentation
Presentation is loading. Please wait.
Published byRonald Copeland Modified over 6 years ago
1
‘Octopuce’ beam test D. Attié, X. Coppolani, P. Colas, M. Lupberger, M. Riallot, J. Timmermans, W. Wang Thanks to K. Dehmelt & U. Renz I’m here to present a TPC review LCTPC WP Phone meeting 119 December ç, 2010
2
Trigger/shutter and handshake schematics
Trigger setup Trigger/shutter and handshake schematics T.U. ∞ Trigger BUSY Trigger TTL level to PC NIM→TTL Out Reset Out PC BUSY TTL→NIM Out = NIM Out Out Out = NIM Out Veto T.U. 1.6 μs T.U. ∞ NIM→TTL Out Shutter active low Start EndM Reset Out Shutter when generated by trigger TRIGGERS December 9, 2010 LCTPC WP phone meeting #119
3
LCTPC WP phone meeting #119
Gas box He/Iso 80/20 Vmesh = 370V TOT mode Shutter time 0.5 s December 9, 2010 LCTPC WP phone meeting #119
4
LCTPC WP phone meeting #119
TPC at 0T He/Iso 80/20 Vmesh = 380V Time mode Shutter Time: 100 us, start given by beam trigger December 9, 2010 LCTPC WP phone meeting #119
5
LCTPC WP phone meeting #119
TPC at 1T He/Iso 80/20 Vmesh = 380V Time mode Shutter Time: 100 us, start given by beam trigger December 9, 2010 LCTPC WP phone meeting #119
6
LCTPC WP phone meeting #119
TPC at 1T He/Iso 80/20 Vmesh = 400V Time mode Shutter Time: 100 us, start given by beam trigger December 9, 2010 LCTPC WP phone meeting #119
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.