PLAN, NETWORK ANALYSIS AND 3D MODELING OF MULTISTORY BUILDING
GROUP MEMBERS : A.KANNABOSE ( ) A.KARTHIKEYAN ( ) P.PREM KUMAR ( ) A.VASANTHAKUMAR ( ) GUIDED BY Mr. MUTHANAND P
2
CONTENT: Abstract Objectives Benefits Literature review Methodology
Plan 3D- views Network analysis Conclusion Reference
3
ABSTRACT This is a FIVE story buildings project. we are complete this project in the following ways such as Planning, Network analysing and 3-D modeling. The project durations are determined by CPM by using MS-PROJECT software.CPM is a technique for analysed projects by determining the longest sequence of tasks through a project network. The overall view of our building is presented in 3- D Modelling using Revit Architecture software.
4
OBJECTIVES Optimum usage of time.
By following this method we can achieve the project within the project duration. The earliest starting time (EST) and latest finishing time (LFT) are calculated. Critical paths are identified. Reduce the time compare to manual or other method.
5
BENEFITS: Improve speed and service Spread your risks
Increase customer satisfaction Updating a module is fast and easy. Teamwork files can also be hot linked to each other. This way, the size of the Teamwork project files and the regeneration time of the 3D models and the documentation can be reduced significantly.
6
LITERATURE REVIEW TITLE: Calculating the Project Network Critical Path in Uncertainty Conditions AUTHOR:FUZZY(2004) Correct scheduling of the project is the necessary condition for the project success. In traditional models, the activities duration times are deterministic and known. In real world however, accurate calculation of time for performing each activity is not possible and is always faced with uncertainty. in this paper, the duration of each activity is estimated by the experts as linguistic variables and the said variables are represented in fuzzy numbers form using the fuzzy theory. .
7
AUTHOR: Peter Stelth (MSc), Professor Guy Le Roy (PhD)
PROJECTS’ ANALYSIS THROUGH CPM (CRITICAL PATH METHOD) AUTHOR: Peter Stelth (MSc), Professor Guy Le Roy (PhD) PUBLISHED IN : JULY 2009 OPTIMIZATION OF RESOURCES, THERE BY INCREMENT OF PROFIT AND REVENUES.TO SERVE AND DEVELOP SPECIFIC FUNCTIONS, PROCEDURES, AND RESPONSIBILITIES.
8
METHODOLOGY Data collection ↓ Plan Detailed estimate CPM using MS project 3Dmodeling using Revit Architecture method
9
TAMILNADU MUNICIPALITY BUILDING RULES:
PLANNING TAMILNADU MUNICIPALITY BUILDING RULES: Tamilnadu district municipality building rules shall apply to the whole of the area which has been declared under the tamilnadu district municipalities act Some of the provisions dealing with the building regulation are given. sites. Distance from electrical lines. Space of building and height of building. Dimensions of rooms. Preparation of building plan. Specification.
10
Type of rooms Minimum area Minimum width
DIMENSIONS OF ROOM : Type of rooms Minimum area Minimum width Habitable rooms 9.50 m2 2.40 m Kitchen 5.5 m2 4.5 m2 ( if separate store provide) 1.80 m / 2.4 m (if dining is attached) Bath rooms 1.80 m2 1.2 m Water closet 1.1 m2 1.2 m Bath & water closet 2.80 m2 Corridors or passage - 1 m Width of stair 0.6 m
12
FIRST FLOOR PLAN VIEW:
18
FRONTELEVATION:
22
AREA DETAILS: SITE AREA - 3000.00 Sq . ft
Ground floor area Sq . ft Typical floor area Sq. ft Flat –A Sq. ft Flat – B Sq. ft Head room area Sq. ft
23
3D VIEWS
24
FRONT VIEW:
25
RIGHT SIDE VIEW:
26
LEFT SIDE VIEW:
28
CAR PARKING :
29
KITCHEN ROOM:
30
DINING ROOMS:
31
LIVING ROOM:
32
BED ROOM:
33
TOILET ROOMS:
35
NETWORK ANALYSIS
36
Introduction Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. CPM - Critical Path Method: In CPM activities are shown as a network of precedence relationships using activity-on-node network construction. Single estimate of activity time Deterministic activity times
37
ABSTRACT ESTIMATES:
38
Task or out turn of labourers:
40
GANT CHART VIEW:
41
NET WORK DIGRAM:
42
CONCLUSION: Planning is done by considering the “ Tamilnadu Building Municipality Rules 1972” of Multistory building .The Planning is Planned as five story R.C.C framed structure. The 3D Modeling of Multistory building is performed using Revit Archicad 2013 ‘software considering. The network analysis is analysed by CPM using ms project considering the detailed estimates and out turn of work. This is likely to be more advantageous for our future generation.
43
REFERENCE: David Adler, “Planning And Design Data”
D.N.Ghose, “A Book of Home Plans” M.Palnikumar,K.Meena, “Civil Engineering Drawing Ι” B.N.Dutta, “Estimation And Costing”. REVIT ARCHITECTURE Windows Release 2013-SOFTWARE AUTOCAD for Windows Release 2013 – software
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.