Download presentation
Presentation is loading. Please wait.
1
SAB Sponsor Progress Report
Joseph Gwinn POSIX: CS/Portable Applications Standards Committee (PASC) 7 June 2013
2
CS/PASC Activity Summary (1)
Active Working Groups The Austin Group has most of the activity The Realtime Group is working on moving into See Additional-Highlights slide WG size: Austin Reflector has ~350 people; of which perhaps 10% generate most of the traffic, and the rest post only when a specific issue surfaces Number of PARs approved YTD: 1 Number of Stds sent to ballot: 1 Number of Stds approved for publication: 1
3
CS/PASC Activity Summary (2)
Cor_1 Standard for Information Technology - Portable Operating System Interface (POSIX) - Corrigendum 1 – was approved This corrigendum corrects technical and other non-editorial errors made during the preparation of , latest version, which covers Portable Operating System Interfaces
4
YTD Additional Highlights
CS/PASC intends to move the technical content of IEEE R into the base POSIX standard, via The Austin Group A submission is being prepared for The Austin Group Policies and Procedures are being aligned with current P&P template
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.