Download presentation
Presentation is loading. Please wait.
Published byHarold Clement Robertson Modified over 6 years ago
1
Test Gases Test Gas MN Wobbe# HHV Primary 1 Baseline, Line Gas 100
MN Wobbe# HHV Primary 1 Baseline, Line Gas 100 1339 1022 2 970 Btu Gas 108 1271 974 or 1000 Btu Gas 106 1315 1000 3 1150 Btu Gas, Hi Wobbe 75 1437 1150 4 1150 Btu Gas, Lo Wobbe 68 1375 4 component mix Secondary 5 1100 Btu Gas, Lo Wobbe 79 1376 1100 5a Tertiary 6 Increase Wobbe 84 1410 7 1150 Btu Gas, 1400 Wobbe 69 1400 8 Set Up Gas 81 1345 1070
14
Steam Boiler Premixed Burner
O2 Gas FVIR Water Heater Wall Furnace Low NOX Steam Boiler Steam Boiler Premixed Burner As Received Rate Input (tuned w/ Base) (tuned w/ Gas 3) (tuned w/ Gas 8) Base 64 60-62 62 66-68 69 24-28 8 21-24 13 2 21 14 3 67 66 65 63 67-68 76 25-30 57 32 4 42 25 4a 53 18 43-44 26 5 43 22 5a 61 39 24 6 72 50 7 68 70 49 27 36 17-24
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.