PCC Meeting March 26, 2014
2
CCPG Primary Transmission Participants
3
CCPG Forum for joint transmission planning
Recognized Planning Group of WestConnect 4-5 Open Meetings/Year February, April, August (Joint with SWAT/Sierra), December Denver TSGT Offices Open to All Interested Stakeholders Meeting Notices/Materials Posted at: WestConnect Transmission Planning - CCPG
4
Map
5
5
6
CCPG Activities Work Groups (CCPG footprint. Multiple years) :
Long Range (10-Year) Planning Study Conceptual (>10-year) Planning NERC Compliance (TPL Adequacy Study) WECC Data Coordination Voltage Coordination Subcommittee Studies (Geographic) Foothills, Western Slope, Denver-metro, etc. Regional Project Study Participation Tot 3, Tot 7 Regulatory Compliance Purpose of the MOU is to finance 3rd party consultants t do studies We are in the process of evaluating and acquiring a consultant Study Scope is being fully defined Want to adhere to FERC 890 and be as open and transparent as possible. The MOU was written to allow additional participants – paying and non-paying. But, even if an entity does not sign the MOU, the Parties will still welcome input and comments from other Stakeholders Intent is to have a web-site for posting materials, as well as a Q&A section.
7
Regulatory Issues Stakeholder Outreach Open Meetings
PUC Rule Requires Regulated Utilities to File 10, 20-Year Plans Use CCPG as Forum Stakeholder Participation Reporting PUC Renders Decision of Adequacy Stakeholder Outreach Open Meetings Study Request / Stakeholder Comment Form Process for Comments/Requests Requests May be Evaluated by CCPG or TP
9
CCPG 2014 Calendar February 13 – CCPG Study Plan Meeting (TSGT Office)
February 20 – WestConnect Annual Meeting (NV Energy Office) April 17 – CCPG Meeting (TSGT Office) August – Joint CCPG/SWAT/SSPG Meetings (TSGT Office) December 11 – CCPG Meeting (TSGT Office) Notices/Materials Posted at: 9
10
Susan Lovejoy – Vice Chair
Contacts Wes Wingen - Chair (605) Susan Lovejoy – Vice Chair (719) Mention that this is the first phase Subsequent phases will address: economics detailed routing Participation Purpose of MOU 10 10