1 Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
PEP-II Hardware Michael Sullivan and John Seeman SLAC National Accelerator Laboratory Feb 15, 2009 Super-B Orsay Meeting

2 Super-B Arc cells layout
M. Biagini Cell #1 Cell #1 LER HER Cell #2 Cell #2 Feb 15, 2009 Super-B Orsay Meeting

3 Super-B Layout with Polarization Jan 2008 (Wienands)
Feb 15, 2009 Super-B Orsay Meeting

4 Lattice layout, PEP-II magnets reuse
Lmag (m) 0.45 5.4 PEP HER - 194 PEP LER SBF HER 130 SBF LER 224 18 SBF Total 148 Needed 30 Total length 1800 m 280 m 20 m Dipoles Available Needed Quads Lmag (m) 0.56 0.73 0.43 0.7 0.4 PEP HER 202 82 - PEP LER 353 SBF HER 165 108 2 SBF LER 88 SBF Total 253 216 4 Needed 51* 134 Lmag (m) 0.25 0.5 PEP HER/LER 188 - SBF Total 372 4 Needed 184 Sexts All PEP-II magnets are reused. Dimensions and fields are properly sized. Feb 15, 2009 Super-B Orsay Meeting

5 Super-B components requested by INFN from SLAC (June 2008)
A) North and South Damping ring components and injection/extraction lines B) Linac accelerator RF distribution waveguide (~72) C) Linac accelerating 3 m sections (~72) D) Linac klystrons (~36) E) Linac klystron modulators (~36) F) Linac QA and QB quadrupoles (23+13) G) Linac dipole correctors (~40) H) Linac polarized gun system & associated three spin rotators with cryo-systems (~1+3) I) Linac e+ target and capture area (~1+spares) J) LER and HER dipoles and quadrupoles (~1022) K) Dipole steering correctors (~836) L) Magnet mechanical supports (~1000) M) Vacuum chambers (~~650) N) RF stations (complete) (~15) O) Feedback systems (~4) P) Diagnostics (~120) Q) Injection hardware (LER and HER) R) Temperature monitors (~2000) S) Power supplies (~800) Feb 15, 2009 Super-B Orsay Meeting

6 Other Requests of PEP-II Components
LCLS at SLAC: Loss monitors SPEAR-3 at SLAC; Bergos BPM electronics Project-X at FNAL: 100 HER dipoles and vacuum chambers Some quadrupoles 12 GeV energy upgrade at JLAB: “A dozen” quadrupoles BEPC-II at IHEP: Two longitudinal feedback kickers CesrTA at Cornell: Electron cloud dipole chicane and chambers Feb 15, 2009 Super-B Orsay Meeting

7 Priorities as set by the US DOE Office of Science
Presently operating or soon to be operating US accelerators. LCLS, CesrTA Future US domestic accelerators. LCLS II, LCLS III, Project-X, PEP-X, JLAB energy upgrade Future US contributions to international accelerator programs. Super-B, BEPC-II Other international accelerator programs. X-FEL Dismantlement and disposal Feb 15, 2009 Super-B Orsay Meeting

8 SLAC Response to Super-B Components of INFN Request (September 2008)
A) North and South Damping ring components and injection/extraction lines FACET B) Linac accelerator RF distribution waveguide (~72)  PEP-X C) Linac accelerating 3 m sections (~72) PEP-X D) Linac klystrons (~36)  PEP-X E) Linac klystron modulators (~36)  PEP-X F) Linac QA and QB quadrupoles (23+13)  PEP-X G) Linac dipole correctors (~40)  PEP-X H) Linac polarized gun system & associated three spin rotators with cryo-systems (~1+3)  Super-B I) Linac e+ target and capture area (~1+spares)  Super-B J) LER and HER dipoles and quadrupoles (~1022)  Super-B and Project-X K) Dipole steering correctors (~836)  Super-B L) Magnet mechanical supports (~1000)  Super-B and Project-X M) Vacuum chambers (~~650)  Super-B N) RF stations (complete) (~15)  Super-B and PEP-X O) Feedback systems (~4)  Super-B and BEPC-II P) Diagnostics (~120)  Super-B, LCLS, SPEAR-3 Q) Injection hardware (LER and HER)  Super-B R) Temperature monitors (~2000)  Super-B S) Power supplies (~800)  Super-B and some SLAC spares Feb 15, 2009 Super-B Orsay Meeting

9 Near term actions Cost estimation:
removal of components from the PEP-II tunnel. packaging the components into shipping containers (steel shipping boxes) transportation costs to Italy Storage costs in Italy Two to four Italian engineers are coming to SLAC in late February (week of Feb 23) to discuss the task and shipping arrangements. DOE formal review of PEP-II Minimum Maintenance state (MMS) and Disposal and Dispersal (D&D) March 23-24, 2009 at SLAC. Feb 15, 2009 Super-B Orsay Meeting

10 PEP-II Hardware Conclusions
The present Super-B design uses many of the PEP-II components. By weight and numbers, most of the Super-B requests can be fulfilled if the project goes ahead. If other projects do not go ahead, then Super-B could get additional components, primarily injection components. Engineers are studying removal, shipping, planning and costing. DOE review of PEP-II MMS and D&D in late March 2009. Feb 15, 2009 Super-B Orsay Meeting