Download presentation
Presentation is loading. Please wait.
Published byHilda Anderson Modified over 6 years ago
1
Jerusalem, 14th of September 2017 Andrzej Wyszogrodzki
STC Report Jerusalem, 14th of September 2017 Andrzej Wyszogrodzki
2
40th STC meeting on 11th/12th Sept.
Participants: A. Wyszogrodzki (Poland, chair) D. Majewski (Germany) P. Steiner (Switzerland) L. Torrisi (Italy) P. Skrimizeas (Greece) G. Stancalie (Romania) D. Kiktev (Russia) Y. Levi (Israel) D. Mironov (SPM) Guest speakers: P. Eckert, J-M Bettems, F. Gofa, M. Köhler
3
IMS – new COSMO member 22 March 2017 all COSMO partners signed annex K to accept IMS (Israel) as the 8th COSMO partner IMS current contributions PP CALMO PT T2RC2 Harel Muskatel PT TERRA Nova Yiftach Ziv
4
Worldwide distribution
COSMO-Model Worldwide distribution Botswana Brazil-INMET Brazil-DHN Namibia Oman Turkmenistan United Arab Emirates 8 (7) licensees in 2017 (Saudi Arabia??). Free usage of COSMO model in developing countries and at universities.
5
Changes in WG4 Pierre Eckert is going on retirement from MeteoSwiss since 2018 COSMO member representatives to form the new WG4 team: M. Paulat (Germany), D. Cattani (Switzerland), A. Canessa (Italy), A. Mazur (Poland), D. Boucouvala (Greece), A. Iriza (Romania), A. Bundel (Russia), A Savir and E. Brainin (Israel) A new coordinator is nominated by the STC: Anastasia Bundel Deputy: Andrzej Mazur
6
Changes in WG4 Next Steps:
Prepare survey for all COSMO member states Formulate TOR Start new PP/PT Considered possible further activities of WG4: guidelines for forecasters, intuitive products for aviation, renewable energies, severe weather blending with observations for ultra short range forecast methods to enhance postprocessing (high res. results) Connections to WG5 and other WGs very important
7
PP/PT extensions complete tasks and provide the deliverables
PP CDIC (WG2) – approved until 08/2018 Task 2 “Ability to handle real-/semi-idealised cases reasonably well” Task 5 “Suitability of ICON dynamical core for other applications than NWP (climate, chemistry, ...) compared to the COSMO model” PP CELO (WG2) – approved until 08/2018 PT TERRA Nova (WG3b) – approved until 06/2018 extension requested because of (i) delayed release of COSMO version 5.05, and (ii) difficulties using VERSUS at ECMWF
8
Decisions on PP/PT extensions
approved PP INSPECT (WG5) – until 12/2017 Task 4 “Overview of spatial methods on EPS systems” Task 5 “Guidelines for relative usefulness of various spatial methods in decision-making“ PP POMPA (WG6) –until 12/2017 delay because of late model releases PP SPRED (WG7) –until 02/2018 Task 1 “Study of the spread/skill relation in the ensembles”, Task 2 “Model perturbation”, Task 3 “Lower boundary perturbation”. Task 4 “Post-processing and interpretation” on-going work at COMET, IMGW
9
PP CEL-ACCEL (WG6) –until 09/2019, Zbigniew Piotrowski
New PP/PT approved PP CEL-ACCEL (WG6) –until 09/2019, Zbigniew Piotrowski COSMO-EULAG on accelerators PT AEVUS (WG3b) –until 08/2018, Paola Mercogliano analysis and evaluation of TERRA_URB scheme PT CIAO (WG7) - until 08/2018 (start 04/2017), Andrea Montani implementation of the Bechtold convection scheme in COSMO model: deterministic and ensemble-mode tests PP CALMO-MAX (WG3b) – until 09/2019 (start 06/2017), Antigoni Voudouri calibration of model (CALMO) methodology applied on extremes
10
conditionally approved (until official SMC evaluation and approval)
New PP/PT conditionally approved (until official SMC evaluation and approval) PP EX-CELO (WG2) – until 09/2019, Zbigniew Piotrowski extension of COSMO-EULAG operationalization PP T2(RC)2 Ph 2 (WG3a) - until 09/2019, Harel Muskatel testing and tuning of revised cloud-radiation coupling PT SAINT (WG3b) - until 05/2019, Sascha Bellaire now cover atmosphere interactions expected for the next STC meeting PP SPRED follow-up
11
Source code management
External access to FIELDEXTRA currently limited to COSMO members. it was decided to grant an external access to scientific community … initially for a single university to estimate what amount of support will be required. the decision for full release was postponed to the next STC meeting
12
Source code management
COSMO Standards for Source Code Development – updates technical changes from the CLM community: now the CLM-SUPTECH working group is responsible for coordinating developments for COSMO new paragraph in Section 6.6 regarding the COSMO-CLM Test Suite included the OpenACC Style Guide in Chapter 4.4 clarify the way how CLM people, who do not have access to ICON right now, can contribute to COSMO-ICON physics without being able to test ICON with their
13
Source code management
COSMO model documentation STC recognizes it is vital to COSMO (both management and scientific purposes) to keep all the model documentation and web pages updated Outdated (~2010) information on the operational settings Limitted information on the suport and training capabilities Missing recent information on PP/PT progress (e.g. PT ConSat4) -> STC will take responsibility to correct this situation
14
NWP Test Suite STC discussed a set-up of test runs: series of forecast, each being reinitialized anew over; one continuous hindcast run (preferable for STC); series of forecasts, where the soil variable run freely and are not reinitialized Further discussion was carried on at parallel session (SPM: still no consensus on some issues) Scientific aspects will be further discussed by the SMC PT (or PP) proposal will be submitted (c/o F. Gofa, A. Montani, M. Milelli, R. Dumitrache, A. Iriza, U. Schättler)
15
COSMO activity proposals for 2018-2019
ISDA (International Symposium On Data Assimilation), March 5-9, 2018 Suport of parallel phase with dycore versions in FORTRAN/C++
16
COSMO activity proposals for 2018-2019
ISDA (International Symposium On Data Assimilation), March 5-9, 2018 previous three ISDA attracted around 200 participants ISDA is organized by DWD and the HErZ branch on DA at LMU Munich in collaboration with COSMO consortium (2014), RIKEN institute in Japan (2015) University of Reading (2016) ISDA 2018 in Munich on March 5-9 expect between 120 and 200 participants COSMO will suport invited speakers and young scientists
17
COSMO activity proposals for 2018-2019
Request for support of parallel phase with dycore versions in FORTRAN and C++ by MeteoSwiss PP POMPA development for hybrid architectures (NVIDIA GPU, multicore x86 CPUs) is being integrated into the official COSMO version. On 34th meeting, STC decided to conduct the parallel phase with both Fortran and C++ dycores retained until Sept 2017 PT EDP2 (WG6) proposition to extend the parallel phase by two years and to reevaluate its necessity in two years' timeframe Granted (after modification) activity proposal to ensure funding for updates, training, support of both CPU and GPU versions
18
Next ICON / ICON-ART Training in Langen from 16 to 20 April 2018
Update on ICON licensing/ agreement DWD – MPI-M : ICON SCIENTIFIC license (institutional) Institutional license because of ECMWF license for IFS physics 27 licensees signed the paper contract until August 2017 ICON code provided by DWD Essential to start implementing and testing ICON with the institutional license Next ICON / ICON-ART Training in Langen from 16 to 20 April 2018
19
Work on the ICON Agreement DWD – MPI-M
xx.xx.2017: ICON SCIENTIFIC license (individual) ready (provided by MPI-M). ICON code provided by MPI-M xx.xx.2018: ICON official duty license (institutional) ready (provided by DWD). Free for NHMS from COSMO partners ICON code provided by DWD xx.xx.2019: ICON official duty license (institutional) ready (provided by DWD). Free for NHMS from development countries With license fee (shared between DWD, MPI-M, ECMWF) for NHMS from developed countries
20
CGM STC/WG reorganization
Goal: reduce bureaucracy, increase productivity Reduction of reporting during STC, most of the information is being presented during plenary sessions Increase presence of SPM in the WG sessions to overlook scientific issues Above require slight modifications in the WG/STC agendas and stricter requirements for submitting in advance proposals/documents for STC evaluation. Some decisions may require earlier SMC approval but decisions can be reached remotely be .
21
Next COSMO General meetings
CGM St. Petersburg – September 2018
22
Next COSMO General meetings
Possible Venue: AZIMUT Hotel, final selection by procurement Saint Petersburg
23
Next COSMO General meetings
CGM 2019 – considered to be in Italy Final decision and possible venue site will be known in the summer 2018.
24
Thank you for your attention
25
19th COSMO General Meeting
Final discussion COMMON issues/topics for the discussion: Issues with COSMO v5.5 cricial for many problems Keeping documentation up to date Coordination of efforts between COSMO/ICON communities for documenting both models (templates) Dissemination of science internally and outside the COSMO Scientific issues still to be discussed/resolved by WG/SMC before the next STC meeting WG4 TOR and scope, cooperation between WGs NWP Test Suite New PPs: SPRED follow up, testing ICON-LAM by COSMO partners Find a new date for the next CGM 2018, doodle poll Strenghtenig the software ingeneering standards
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.