1 WATER MAIN REHABILITATION
Extending & increasing the value of your assets for decades Spray-Applied ANSI/NSF61-5 Polymeric Resin (Polyurea)

2 Common Water Infrastructure Problems
Corrosion Reduces flow and pressure Reduces water quality Fatigue Leaks and breaks through: Soil type Aging Temperature variations

3 Spray-Applied Lining Spray hose up to 150 meter length
Number of spray passes (1mm each) determines the level of protection desired from non, to semi, to fully structural.

4 Modern and ‘’green’’ Technology
Spray-Applied Polymeric Resin Atomizing plural components BEFORE spraying enhances structural properties

5 About Spray-Applied Polymeric Resin
100mm (4’’) diameter and above, larger diameters sprayed by hand (pipes, manholes, …) Currently, design calculations are ASTM F1216 to determine liner thickness 7 seconds snap cure, bonds to the substrate No intercoat delamination detected in any spray applications. If only partially completed after 8 hours, suggest mechanical abrasion to lining in place to insure proper adhesion Ring stiffness, resistance to vacuum C-Factor: 110 or higher, 10% elongation, not brittle

6 About Spray-Applied Polymeric Resin
Burst: exceeding 150 psi internal pressure (ie. 3mm thickness, 150mm) Withstand external load and groundwater Bonds to the host pipe (pull test in excess of psi) Excellent sealing of service connections Life extension: decades, according to real life testing 3rd party testing:

7 Independent Test Programs for ASTM F1216

8 New ASTM Standard Acuro is part of the research group working on the development of the new ASTM WK23937 Standard

9 May 2009 EPA State of Technology Report

10

11 EPA May 2009 Technology Report

12

13 SUMMARY OF PROJECT WORK STEPS

14

15 Project Area

16 Bypass System Bypass installed on both sides of the street

17 Water Main Characteristics
Dark spots show Bitumen After cleaning, we noticed that the walls were coated with bitumen. Location: Barnardo and Lee Streets Diameter: 150mm (6in.) Material: Ductile iron Length: Approximately 225 meters in total Historic: Some water quality complaints, … About two months later, we lined an additional 120meters of 125mm diameter (5’’) water main

18 Resin Projection In the access pit… Spray gun Spray hose

19 In the field… Cleaner CCTV Spray rig Power rig Utilities Pit

20 In the field…

21 Standard Project Start
Temporary Bypass Access pit at both ends Clean water main using pressurized water or scrapers

22 Dry Pipe Dry wall Damp wall Air flow Pressurized air

23 Patching holes (when needed)
Install pipe patch to cover apparent holes prior to spray

24 Structural Assessment (Optional)
Electromagnetic probe (Eddy Current) inserted along the entire length of the water main determines wall thickness loss Wall thickness loss

25 Results in Peterborough

26 Results in Peterborough
Summary % Wall Thickness Loss

27 Work Steps 1. Cleaning 2. Assess 3. Rehabilitate
Water Main Rehabilitation - CARE Work Steps 1. Cleaning 2. Assess 3. Rehabilitate AWWA Classes: 4 3 2 1

28 Spray-Applied Equipment

29 Spray-Applied Technology

30 Spray-rig software provides results for each spray
Computerized Control Cataloging spray applications Spray-rig software provides results for each spray

31 Pipe Lining Results

32 Natural waving inside PVC pipe Acuro Polymeric resin lining
Our Goal to Achieve a Smooth Interior Wall Natural waving inside PVC pipe Acuro Polymeric resin lining

33 Service Connections

34 CCTV Inspections & Cutter
Stand-alone camera & cutter

35 Service Restoration Water main disinfection and flushing
Hydraulic readings and pressure testing Water sampling and testing Service and site restoration

36 Benefits & Costs Savings
Non, semi, or fully structural liners Seals service connections Adds decades of service Benefits Stops leakage / breaks Increased pressure / flow and water quality Costs Savings Reduced emergency repairs High savings vs replacement 100% Renewable Minimal C02 emmissions Minimal public disruption

37 THANK YOU QUESTIONS? Ottawa – Montreal – U.S. (Ohio, Michigan)