3 Gordon: He dead.

4

5 08 Feb: What Went Well Internal & Interagency Coordination
Response time from OSROs Public Outreach

6 08 Feb: Lessons Learns Night Ops Basic Essentials; Remote Location
Technology Constraints Don’t forget to breathe!

7 09-15 Feb: What Went Well Safety Plan
Pumping Ops/OSRO Response (~ 30K) Shoreline Clean-Up Public Outreach Interagency Coordination

8

9

10

11

12

13 Moving Forward: Feb-Apr 2017
Situation Stabilized; Weekly Boom Checks PPE Concerns Removal Process; Substantial Threat Public Concerns & Media Interagency Coordination NPFC, SILC, & SERT

14

15

16 Unexpected Challenges
*MER discovers flooded engine room (42’’ above the deck plates) - 60,000 gallons pumped off by 14Apr17 *Due to hull integrity issues, determined removal of vessel was best option.

17 Unexpected Challenges
*MER discovers flooded engine room (42’’ above the deck plates) - 60,000 gallons pumped off by 14Apr17 *Due to hull integrity issues, determined removal of vessel was best option.

18 Unexpected Challenges
*MER discovers flooded engine room (42’’ above the deck plates) - 60,000 gallons pumped off by 14Apr17 *Due to hull integrity issues, determined removal of vessel was best option.

19 Unexpected Challenges
*MER discovers flooded engine room (42’’ above the deck plates) - 60,000 gallons pumped off by 14Apr17 *Due to hull integrity issues, determined removal of vessel was best option.

20 Preparation For Removal

21

22 Removal Operations

23

24 Brownsville, TX

25 Final Lessons Learned Safety Good steward of the fund
Logistics (Bridges, road closures) Claims ARAR

26 Highlights Risk Management Safety Interagency Coordination
Gulf Strike Team Reserve augmentation NPFC & SILC Instincts...