1 Facilities Update November 17, 2017

2 Sierra Vista Completion
December 15th, 2017. Relocation to Sierra Vista scheduled December 15th and 16th for multiple departments and with second and third follow up phasing. Instruction: 31 offices Student Services: 53 offices

3 Relocation to Sierra Nevada
Relocation of EOPS , Financial Aid, Admissions and Records, Counseling, Career Services, Transfer Center, Assessment, Bursar and Instruction to Sierra Vista December 15th and 16th, 2017 EOPS Annex Financial Aid Office and Assessment Admission and Records and Bursar 1, 2 & 3 1 2 1 3 2 3

4 Relocation and Space Plan
Moving company to manage and assist with relocation. Boxes issued 11/27/17. Each floor will be color coded for personal materials placement. PE and VG Trailer move on February 22, 2018 with all remaining relocations as noted.

5 Phones and Data Tracking
1) Cabling Completed, line dedication November 1, 2017 through December 10, 2017. 2) All lines transferred during December move. Phones 1) All lines transferred during December move.

6 San Rafael and College Police
Relocation of San Rafael 2nd Floor to Sierra Vista December 15, to completion. Relocation of Police to EOPS January 2, 2018. DSPS from San Rafael to San Fernando December 2018 San Rafael 2nd Floor DSPS to San Fernando Trailer College Police to EOPS Trailer Facility to allow Police Remodel. 6 7 6A 6 6 6A 7

7 Sierra Nevada and Library Remodel
Sierra Nevada Secondary Effects Remodel and HVAC system from November 1st - April 2018. Library Dome Renovation December 14, February 15th, 2018 3

8 PE, Verdugo Gym and San Fernando Trailers
Financial Aid Bungalow conversion to 2 classrooms, football lockers, coaches offices Assessment Bungalow conversion to 3 classrooms and maintain CalWORKS Two new trailers on basketball court to house DSPS, Title V and classrooms San Fernando Complex and Assessment building to refresh into classrooms and remain throughout the 2017 and 2018 scheduled years. CalWorks to remain until San Rafael second floor is renovated. 4 5 4 5A 5 5A 5

9 Anthropology, Journalism, and Culinary Arts
Relocation of Culinary Arts Office to Sierra Vista building January 21, 2018 Journalism and Anthropology Department moves TBD Culinary Arts 8 8 8 8

10 Human Resources Relocation of HR to Admissions and Records April 11th, 2018 HR Relocation from Trailer 9 9 9 9

11 Athletics Facility Expansion
Plans to DSA for approval January 2018 DSA issuance of permit August 2018 Bidding process Sept – Nov 2018 Construction Dec 2018 – April 2020 Occupancy Fall 2020

12 SITE PLAN

13 Sierra Nevada temporary swing space remodel
PROJECT INCREMENT #1 Sierra Nevada temporary swing space remodel

14 Western portion Demolition, Grading & Utilities
PROJECT INCREMENT #2 Western portion Demolition, Grading & Utilities

15 PROJECT INCREMENT #3 Verdugo Athletics Building Structure

16 Parking Lot E & Concession
PROJECT INCREMENT #4 Parking Lot E & Concession

17 PROJECT INCREMENT #5 Utilities Upgrades – Infrastructure

18 Seismic Upgrade Exist. Gymnasium
PROJECT INCREMENT #6 Seismic Upgrade Exist. Gymnasium

19 LANDSCAPE DESIGN CONCEPT

20 NORTH ELEVATION WEST ELEVATION

21 BIRD’S EYE VIEW FROM WEST

22 EXTERIOR VIEW FROM NORTH WEST

23 PROGRAM SPACES LOWER LEVEL ATHLETIC TRAINING SHOWERS WEIGHT TRAINING
LOCKERS CLASS/TEAM ROOM(S) ATHLETIC TRAINING WEIGHT TRAINING OUTDOOR FITNESS ADAPTED P.E. TIERED OUTDOOR LANDSCAPE

24 PROGRAM SPACES UPPER LEVEL AUXILIARY PRACTICE GYM COVERED WALK WAY
FACULTY OFFICES AUXILIARY PRACTICE GYM COVERED WALK WAY ELEVATOR / STAIRS ENTRANCE

25 BIRD’S EYE VIEW FROM NORTHWEST

26 Other Projects During 2018 Purchase of land at Garfield Campus
Renovation of classrooms at Verdugo Campus Construct surface parking at Garfield Campus Address science lab and science instruction space needs Plan expanded flexible instructional classroom spaces and music and dance facilities