I-5 Corridor Reinforcement Project
ColumbiaGrid Regional Review September 5, 2007
2
Project Purpose The purpose of the project is to address the following: Transmission service requests (Long-term) Generation interconnection requests Path Congestion Increasing summer peak loads and existing contractual obligations to serve them Reduce dependence on existing RAS while maintaining transmission system reliability
3
New Substation -Troutdale 500kV Line and Routing Options
4
Recommended Plan of Service
BPA’s recommended plan of service is to construct a 500 kV line from a New substation north of Allston, to Troutdale substation The major elements of this plan are: Construct a new 500kV three breaker ring bus approximately 12 miles north of Allston substation (near Castle Rock, WA) tied into the Napavine-Allston 500kV line. Construct a 500kV three breaker ring bus at the Troutdale 500kV yard Construct approximately 70 miles of new 500kV line from the new substation (north of Allston) to Troutdale.
5
Path Capacity Preliminary study results indicate the following increases in path capacity with the I-5 Corridor Reinforcement project. NOTES: These values were based on a comparison assuming the same generation pattern presently used to establish Operating limits on the paths. These values will vary based on season, generation pattern, etc.
6
What Has Been Done Identify the Problems
Identify the Limiting Conditions (Study Assumptions) Thermal Analysis Some Voltage Stability Analysis Evaluate Alternative Solutions Develop a Recommended Plan of Service
7
What Remains to be Done Post Draft Report and Base cases
Complete Voltage Stability Analysis Transient Stability Analysis Sensitivity Studies Alternate Plans of Service or Other Projects Finalize Report