Open Charm Measurements with a Small Acceptance Vertex NA61

Similar presentations


Presentation on theme: "Open Charm Measurements with a Small Acceptance Vertex NA61"— Presentation transcript:

1 Open Charm Measurements with a Small Acceptance Vertex Detector @ NA61
Project duration: M. Deveaux, Goethe University Frankfurt

2 Why this geometry? SAVD covers 35% of NA61 acceptance for D0+D0bar.
M. Deveaux

3 Expected results (GEANT4 Simulation)
A. Andronic, Workshop on discovery at the LHC, Kruger 2012 SAVD + NA61 Ideal PID Always preliminary Always preliminary SAVD + NA61 No PID Expected performance (preliminary): ~ 1000 D0 + D0-bar /week (Pb+Pb, 156 A GeV, HSD multiplicity) S/B = 0.5 (No PiD), 13 (ideal PiD) SNR = 22-30 M. Deveaux

4 Status of the proposal Status: Proposal filed early 2015
Decision 15. July 2015 => No funding Expect report ~15. August Potential reasons: Too expensive for this term Scientifically to weak No NA61 funding possible via DFG Rework and refile for early 2016 Show stopper for german funding. In any case: No funding available in 2015 (also not from my regular budget) M. Deveaux

5 Status of the project Accordance of NA61: OK, M. Gazdzicki
Sensors: Established in CBM and EU-Det Purchase: Already done by NA61 Support: Granted by M. Winter et al. (IPHC) Payment of 2 sensors open (?) Sensors QA: Demonstrated in CBM Responsible: Deveaux / M. Koziel, IKF - Frankfurt Support/Infrastructure: Prof. J. Stroth (IKF) All ressources available, no spares Mechanical support (ladders): ALICE - ITS Purchase: Agreement NA61 – ALICE (L. Musa) Responsible: G. Feofilov (St. Petersburg) Funding: Russian funding (available) M. Deveaux

6 Status of the project Sensor integration: Established in CBM
Responsible: Deveaux / M. Koziel, IKF - Frankfurt Support/Infrastructure: Prof. J. Stroth (IKF) Missing resources for flex cable. Mechanical support (Detector, cooling): Responsible: P. Stazel (Krakow) + Engineer. Funding: Polish funding, granted. FEE: Available, CBM Responsible: Deveaux / J. Michel. Funding: Polish funding (available). Missing resources for hardware. Missing resources for manpower. M. Deveaux

7 Status of the project DAQ (Hardware/Software):
Established (CBM), needs adapting to NA61 Responsible: Deveaux, J.Michel (TRB-collab.) => Technology transfer to W. Kucewicz, Krakow Missing hardware in Krakow. Missing ressources for manpower. Data analysis / simulation: Codes: CBM (Deveaux, et al.), need to be adapted. Simulation: P. Staszel Analysis: P. Staszel, M. Deveaux Missing ressources for manpower. Dag took over to some extend. Beam time: Test run end of 2015, early 2016 (already requested). Production beam time to be requested by NA61 for 2016 and 2017. M. Deveaux

8 What is needed? Ressources for DAQ hardware (preliminary):
Name Amount Cost/Unit Incl. 19% VAT Total Total + Incl VAT CB PCB 12 638,40 759,70 FEB PCB 120,00 142,80 CB Components 140,00 166,600 1680,00 1999,20 FEB Components 10,00 11,900 Assembly CB 30,00 35,700 360,00 428,40 FPC Sensor -FEB 550,00 654,50 FPC FEB – CB 24 4,00 4,76 96,00 114,24 TRB3sc 5 500,00 595,00 2500,00 2975,00 TRB3sc crate 1 150,00 178,50 TRB3sc AddOn 4 100,00 119,00 400,00 476,00 Cables 420,00 PowerSupply 2x 4V/8A 2 300,00 357,00 600,00 714,00 Supplemental Electronics Sum 9442,14 FPC FPC Standard, 0.15% X0 FEB – Front end board CB – Converter Board TRB3sc – Updated and lighter version of TRB3 Moreover: Ethernet infrastructure: 500€, Computer: 1000€

9 What is needed? Ressources for DAQ hardware (preliminary):
Name Amount Cost/Unit Incl. 19% VAT Total Total + Incl VAT CB PCB 12 638,40 759,70 FEB PCB 120,00 142,80 CB Components 140,00 166,600 1680,00 1999,20 FEB Components 8,00 9,520 96,00 114,24 Assembly CB 30,00 35,700 360,00 428,40 FPC Sensor -FEB 550,00 654,50 FPC FEB – CB 24 4,00 4,76 TRB3sc 5 500,00 595,00 2500,00 2975,00 TRB3sc crate 1 150,00 178,50 TRB3sc AddOn 4 100,00 119,00 400,00 476,00 Cables 5,00 5,95 PowerSupply 2x 4V/8A 2 300,00 357,00 600,00 714,00 Supplemental Electronics Sum 9056,38 FEB – Front end board CB – Converter Board TRB3sc – Updated and lighter version of TRB3 First priority: Buy this hardware => Integration and Krakow projects can be continued. M. Deveaux

10 How to do? Idea of Marek: Money for sensors still to be paid back to common fund. Reduce repayment by ~10kEUR. Use money for purchasing electronics via Krakow. Wait for referee reports and plan next steps. Needs to be defended in front of the NA61 collaboration board => Marek‘s job M. Deveaux