East Area Cooling & Ventilation Status
East Hall under construction East Area Cooling & Ventilation Status Francesco Dragoni (EN-CV)
2
CV Work Package Overview
Building 251 Building ventilation PC water cooling East Area Hall Primary zone ventilation Hall ventilation Magnets cooling ATEX (NEW) F. Dragoni,
3
Planning – Kick-off Mid Sept 2017
PZ Ventilation Hall Ventilation Magnets Water Cooling B251 Vent & Water Cooling F. Dragoni, PT12
4
Progress: Primary Zone Ventilation
Design in progress with 3 operation modes Dynamic confinement Target underpressure: -20Pa Motorised dampers Fresh air supply during access HEPA filters: Recirculated air Exhaust air F. Dragoni,
5
Progress: Hall Ventilation
Consolidate building ventilation New AHUs, power, instrumentation & control New superheated water distribution network Building Thermal Study in progress 8x Hall AHUs Total Flow m3/h Fresh Air m3/h 4x Hall AHUs Flow m3/h Fresh Air m3/h F. Dragoni,
6
Thanks for your attention !
F. Dragoni, PT12