1 LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013

2 Connector shell made of bluestone SLA with mounting points built in
PM assembly Connector shell made of bluestone SLA with mounting points built in Mu metal cylinder SMA adaptor made of bluestone with mounting point built in 12/10/2013 Erik Richards

3 PM assembly Photomultiplier SMA connector 12/10/2013 Erik Richards

4 PM assembly 12/10/2013 Erik Richards

5 Spot welded to the support cylinder Copper cooling pipe
Under thermal calculation to validate the cooling lines dimensioning Cooler assembly Aluminum Support Spot welded to the support cylinder Copper cooling pipe Aluminum support tube 12/10/2013 Erik Richards

6 Removing or installing PM
Loosen assembly screws and slide PM back Purpose : Fast removal Avoid to loose small bolts 12/10/2013 Erik Richards

7 Lucid support cylinder
Cable trays Sliding supports 12/10/2013 Erik Richards

8 Services support Lucid services Beam pipes services
The purpose is to create a Patch panel for a fast disconnection (ALARA) 12/10/2013 Erik Richards

9 Beam pipe & Lucid services
Create solid cable trays to define clear volume. of installation. The purpose is to minimize the risk conflict during installation/removal of the package (ALARA) 12/10/2013 Erik Richards

10 Services from LUCID and beam-pipe
Services support Big Wheels Plug Services from LUCID and beam-pipe JFC1 12/10/2013 Erik Richards

11 Services support structure
Patch panel Services support structure 12/10/2013 Erik Richards

12 Services support 12/10/2013 Erik Richards

13 Articulated support structure
Services support Articulated support structure Fixed support structure The purpose of the support structure is to avoid the Big Wheel during installation/removal of “VJ package” 12/10/2013 Erik Richards

14 Automatic gravity hook Existing lifting beam modified
Lifting tool Automatic gravity hook Existing lifting beam modified Alignment system Purpose of this new lifting beam : - Remote handling by the crane operator to avoid any human intervention 12/10/2013 Erik Richards

15 This will not be possible anymore !
12/10/2013 Erik Richards

16 Lifting tool 12/10/2013 Erik Richards

17 Lifting tool Check potential conflict with services support structure
12/10/2013 Erik Richards

18 Lifting tool 12/10/2013 Erik Richards

19 schedule Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14
Jun-14 Jul-14 Design Order Assembly Test 12/10/2013 Erik Richards

20 Conclusions Conceptual design is finished Design work :
Finalise the patch panel design (LUCID + Beam Pipe) Finalise the service routing around the carbon fiber pipe Finalise the design (optimisation for production) Prepare production drawings Simulation : Cooling circuit is under dimensioning check 12/10/2013 Erik Richards


Download ppt "LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013."