1 Nimr Hazard Hunt Medco 15th Nov 2017
MSEM Partnership in HSE 2017 Top9 HSE exposures Hazard Hunt

2 Medco Nimr- Wazeer North 003, Beam pump Preventive Maintenance Hazard Hunt Team

3 Medco Nimr- Wazeer North 003, Beam pump Preventive Maintenance
Engagement moments

4 Accessing lifting bucket
Medco Nimr- Beam pump Preventive Maintenance Accessing lifting bucket 3 2 Missing canter fall protection Slipping hazard Congested access 1

5 Missing gear/lever cap
Medco Nimr- Beam pump Preventive Maintenance Missing gear/lever cap

6 Isolation process- Sharp edges
Medco Nimr- Beam pump Preventive Maintenance Isolation process- Sharp edges

7 Medco Nimr- Beam pump Preventive Maintenance
Tripping Hazard

8 Pressure /splashing exposure
Medco Nimr- Beam pump Preventive Maintenance Pressure /splashing exposure

9 Working at height/ Good practice
Medco Nimr- Beam pump Preventive Maintenance Working at height/ Good practice

10 Corroded electrical transformer
Medco Nimr- Beam pump Preventive Maintenance Corroded electrical transformer Corroded damaged gate falling object Corroded damaged roof falling object/ and particles while cleaning

11 Medco Nimr- Beam pump Preventive Maintenance
Uniting using the right tool (best practice) VS the wrong tool exposed to pinch point VS

12 Medco- Abraj Rig 105 Hazard Hunt Team

13 Pinch points identification
Medco- Abraj Rig 105 Good practice Pinch point / wrong finger placement

14 Pinch point identification
Medco- Abraj Rig 105 Pinch point identification

15 Pinch points identification
Medco- Abraj Rig 105 Operating/engaging the lever while a colleague finger placed at pinch point (all in a medial of conversation not focusing on the task)

16 Several pinch points identified
Medco- Abraj Rig 105 Several pinch points identified

17 Tripping hazard/poor housekeeping at the rig fabrication workshop
Medco- Abraj Rig 105 Tripping hazard/poor housekeeping at the rig fabrication workshop

18 Medco- Abraj Rig 105 Puncture hazard

19 Medco-Flow-line Maintenance Crew

20 Medco-Flow-line Maintenance
Engagement moments

21 Medco-Flow-line Maintenance
Sharp edge

22 Medco-Flow-line Maintenance
Damaged over used desk

23 Medco-Flow-line Maintenance
Un-authorized stand used to support the flow-line

24 Medco-Flow-line Maintenance
Fire Hazard-Protective plywood instead of Fire resistant cover

25 Medco - Logistic & Warehouse Team

26 Medco - Logistic & Warehouse Team
Slip hazard - Step unbalance require anti slippage MAT

27 Medco fabrication workshop team

28 Medco fabrication workshop
Falling object /Unsecured overhead crane control machine

29 Medco fabrication workshop
Home made hammer unauthorized welding and No good grip on the handle

30 Medco fabrication workshop
Mushroom CHISEL

31 Medco fabrication workshop
Use chisel with hand guard Mushroom CHISEL mushrooming on the striking end

32 Medco fabrication workshop
Damaged hammer

33 Medco fabrication workshop
Ergonomic hazards Poor body posture / repetitive movement/uncomfortable workstation

34 Grinder speed VS fitted desk
Medco fabrication workshop Grinder speed VS fitted desk Use V block for changing the wheel. Ensure that the speed of the wheel is more than (or equal to) the rated speed of the machine.

35 Medco fabrication workshop
Tripping hazard

36 Medco fabrication workshop
Obstructed walk way

37 Medco fabrication workshop
No tracking for the webbing slings inspection and certification

38 Medco fabrication workshop
Engagement moments

39 Recommendation Although hazard hunts were conducted by key personal it is recommended by the team to; set a schedule and involve the crew members in future hazard hunts, engage crew by using probing questions (i.e. what could go wrong?, how can we make it safe?), encourage people to think and motivate them to bring forward solutions. need to allow quality time for safety dialogue on hazards and controls (highly motivated and knowledgeable staff and crew). Include hazard hunt in Contract HSE plan with the involvement of Petrogas and Medco management team. PDO CR requested support from MSE to verify and check the hazard hunt quality run by Petrogas and MEDCO during 2018.