Presentation is loading. Please wait.

Presentation is loading. Please wait.

Camera to Top End Assembly Integration Travis Lange Camera I&T M. E

Similar presentations


Presentation on theme: "Camera to Top End Assembly Integration Travis Lange Camera I&T M. E"— Presentation transcript:

1 Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
Camera to Top End Assembly Integration Travis Lange Camera I&T M.E. LSST 2017 Project & Community Workshop August 16, 2017

2 Discussion Topics Space Planning in Summit Maintenance Area Un/under-defined Utilities Connections Tooling Needed for Integration

3 Space Planning at Summit Maintenance Area

4 3rd Floor Camera Maintenance Facility
White Room Camera Staging and Test Area Clean Room Utility Area Walkway Mirror Coating Facility

5 Receiving the Camera and Prepping for Install
Camera Integration Stand BOT Camera Staging and Test Area Clean Room (class 10,000) White Room (class 100,000)

6 Camera Testing & Alignment
“Umbilicals”– Refrigeration, Power, Fibers, Copper Comm

7 Prep Hexapod/Rotator Assembly
Camera Integration Assembly Stand/Cart Camera Top End Assembly

8 Integrate Camera on Hexapod/Rotator Assembly
“Umbilicals”– Refrigeration, Power, Fibers, Copper Comm Complete Camera Top End Assembly ready for telescope

9

10 Un/Under-defined Utilities

11 Utility interfaces are defined in LSE-64 and LSE-65 Still Need:
Utility Topics Utility interfaces are defined in LSE-64 and LSE-65 Still Need: Better definition of utility locations in Camera Maintenance Area Topic is covered by LCR-917 Addition of power for Camera Integration Stand Topic is covered by LCR-949 Define end-to-end connections of refrigeration protection See following slides Define end-to-end connections of refrigeration Define end-to-end connections of fiber optics Utilities need to connect to both Camera UT and back of Cable Wrap

12 Updated Staging Area Utilities
Additional Nitrogen Tap New 220VAC/3-phase/48A per phase for Camera Integration DAQ/CCS Fiber Optic Refrigeration Isolation Valve Panel 380VAC/3-phase outside White Room door

13 Refrigeration Protection Communication
Need similar layouts for DAQ/CCS Fibers and Refrigeration Lines Credit: P. Hascall

14 Tooling Needed for Integration

15 Mounted to the Integrating Structure
How do we keep the bulkhead plate in position during integration? Need to align bulkhead plate to top end assy center bearing Camera needs a restraint for holding in place during shipping

16 Bulkhead Plate as Viewed from Camera
Tolerance for center bearing?

17 Cable Wrap and Bulkhead Plate

18 T&S provides cart to hold Top End Assy
Tooling Questions Camera provides lift fixture to move Camera from Integration/Test stand to Top End Assy T&S provides cart to hold Top End Assy Camera provides bulkhead plate restraint? Requirements? Guiding of Camera into Top End Assy provided by T&S? Tooling required for this? If so, must use features already defined in ICD (LSE-18)

19 End of Presentation


Download ppt "Camera to Top End Assembly Integration Travis Lange Camera I&T M. E"

Similar presentations


Ads by Google