Presentation is loading. Please wait.

Presentation is loading. Please wait.

2013 Specification Implementation

Similar presentations


Presentation on theme: "2013 Specification Implementation"— Presentation transcript:

1 2013 Specification Implementation
Joseph Anthony, P.E. Construction Cost Estimating Section Manager Ohio Department of Transportation Division of Planning-Office of Estimating

2 Office of Estimating 2013 Specification Implementation
Our Responsibilities: 2013 Item Master (Available on Internet) 2013 Estimator® Catalogs (Will be Available on Internet) 4 Catalogs: Asphalt, Bridge, District-Wide, & Other Contain New Item Codes (e.g. 611) Do Not Contain Retired Item Codes (e.g., 603 & 604) In the Near Future, Link Historical Bid Data From the Old to New Item Codes (e.g., 603E00100  611E00100) 2013 Proposal Note List (Available on Intranet)


Download ppt "2013 Specification Implementation"

Similar presentations


Ads by Google