Download presentation
Presentation is loading. Please wait.
1
3rd November 2017 Simplification 35
2
Restock Sites Site Company Amount Brent Charlie Shell 2 Brent Bravo 5
Nelson Shearwater 3 Barrow Centrica 20 Dunlin Fairfield Scott Nexen
3
Existing Sites Site Company Armada Shell Heather EnQuest Lomond
Thistle North Everest Northern Producer Shearwater EnQuest Producer Brent Charlie Golden Eagle Nexen Nelson Scott Brent Bravo Buzzard Bacton Gas Plant Uxbridge Office Seafox Four Discovery House Leman Alpha Hummingbird Wood Curlew Fab Shop Gannet Nigg Clipper CATS Brent Alpha Beatrice North Cormorant TAQA SAGE Aberdeen Bristow CPC Centrica Miller Petrofac Barrow Terminal Aberdeen yard Stork EnerMech Southport yard Maersk Training Ensco 120 ConocoPhillips Cresent Office Cresent Ensco 92 Aker Office Aker 59 total, of which 37 are offshore
4
Existing Sites Site Company Dunlin Fairfield GMS Endurance Centrica
Mariner Stat Oil Murdoch Conocophillips LOGGS Rubislaw House Brittania TGT Jade Jasmine Concophillips Judy Magnus EnQuest Company-wide ESS Koonberg Shell WellsCentric Haysham Plant SVT Terminal Total = 59 Hazardous Sites = 45 Non-Hazardous Sites = 3 Other = 11
5
Pending Sites Site Company Sparrows Kraken Bumi Armada Rentair
Centurion Group Conserve Oilfield Services Safety & Technical Hydraulics ATR Lifting Solutions Underwater Engineering Services ATR Equipment Solutions Anasuria Petrofac Kittiwake FPF001 Hewett Complex Horne & Wren Irish Sea Pioneer BP
6
Engaged Sites Site Company Altus Intervention Apache Bilfinger
Forties Pipeline BP Bureau Veritas Chevron Global Energy Peterson QuEnSh TOTAL Hydratight Site Company ARA Petroleum ARA Petroleum - Oman Apache Apache – folder Mech Tech Engineering Chrysaor Repsol Wood
7
Updates Shell OneGas entirely using system
ARA Petroleum in Oman looking to roll out
8
Community of practice
9
Meetings The community of practice group meet every month to discuss how SWE is being used at site, how any problems have been solved and sharing ideas to engage. All sites/ companies looking to roll out SWE are welcome to attend one of these meetings to find out more
10
Product Development
11
Progress The product development group are looking at ‘what’s next?’ for simplification. The group are focussing on hazard identification and Task risk assessments
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.