Download presentation
Presentation is loading. Please wait.
1
ELCITA UPDATE November 2017
2
Estate Management Foot Over Bridge – Final Approval from CGM, NHAI is awaited. Traffic Signal – Vendor Status Sl.no Vendor Status 1 BEL They will make a presentation and a site visit on Monday ( ) at 2.00PM 2 SIEMENS Spoke with Mr. Ashok he is out of Country, Mr. Gowrav is yet confirm their visit 3 Synertech system They inspected the site, we are expecting their quotation on 4 Charitha Electricals we have received revised quotation on For 4 Junctions=Rs.31,10, with singal pole structure 5 Media Group They inspected site & we waiting for quotation 6 Envoy Expecting a BOQ for them to quote 7 Trafitronic India Pvt.Ltd we are waiting for their quotation
3
Estate Management
4
Estate Management
5
Estate Management
6
Estate Management
7
14 Nos of Camera Installed and configuration work in progress (West Avenue 8)
8
Footpath Works– Completed
West Avenue 9 (NRN Holdings) West Avenue 6 (Wipro Junction)
9
Culvert & Painting Work – Completed
East Avenue-4 (Near Continental) West Avenue 10 (Canara bank Road)
10
Kerbstone Resetting @ West Avenue-9
Road Widening – Completed Kerbstone West Avenue-9 West Lane-7
11
West Avenue- 6 (Shikaripalya Road)
Scientific Speed Hump – Completed West Avenue- 6 (Shikaripalya Road)
12
East Avenue-2 (Xime Road)
Road Work – Under Progress East Avenue-1 (TCS Road) East Avenue-2 (Xime Road)
13
Footpath Work – Under Progress
East Avenue-1 (Near Tata Power) West Avenue 9 (Near Mro Tek)
14
Misc Work – Under Progress
Drain East Avenue-5 (Near Continental) RCC Pedestal East Avenue-1 (TCS Road)
15
Replace Twin Pole Transformer Structure by SPUN pole
Electrical Work – Completed Replace Twin Pole Transformer Structure by SPUN pole
16
Capacitor panel installed at STP for Power Factor improvement
Electrical Work – Completed Capacitor panel installed at STP for Power Factor improvement
17
Installation of 6 KVA UPS for Street light (Traffic Police Station)
Electrical Work – Completed Installation of 6 KVA UPS for Street light (Traffic Police Station)
18
Installation of 6 KVA UPS for Street light (Traffic Police Station)
Electrical Work – Completed Installation of 6 KVA UPS for Street light (Traffic Police Station)
19
Electrical Work – Under Progress
Coordination with BESCOM for converting from D.P to spun pole at West Phase near HCL
20
Electrical Work – Under Progress
Coordination with BESCOM for converting from D.P to spun pole & RMU proposal
21
Dodathogur students – Eco friendly Diya making for Diwali
22
Waste/treated water to vegetables
ELCITA OWTP Waste/treated water to vegetables Total compost sold is 953 Kg.
23
IGG up gradation of Analytics
Individual reports per company. Recycling percentage per company Top Reject waste generators
24
E-waste Total E – waste disposed – 1.5 tons in October
25
Planning for KROHNE Marshall Flow meter for 300 KLD STP
STP – Pump house Section plan of Dewats New 9KLD STP at pump house road Planning for KROHNE Marshall Flow meter for 300 KLD STP
26
Contracts on Anvil Providing Services for Solid Waste Management to ELCITA within e-city Industrial Township Area. Providing Services for lifting sewage/Treated water by using Tanker Vehicle within e-city Industrial Township Area. Construction of 400 KLD STP in KSSIDC Land, West Phase. Construction of 500 KLD STP in KIADB Land, East Phase.
27
Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.