Download presentation
Presentation is loading. Please wait.
1
David Garrett decision analysis services
2
decision analysis services
We exist to enable informed and robust decision-making by owners and operators of critical national infrastructure. Independent consultancy Based in UK and Australia Clients on 4 continents Primary focus on Defence, Energy, Transport and wider Government decision analysis services
3
Operating & Support Cost Analysis Model
Used to generate operating and support cost estimates for US DoD equipment programs At its core is a System Dynamics simulation that determines the costs generated each month of the lifecycle based on the status and activities of equipment
4
First OSCAM models developed in 1996 as a joint program between the US DoD and UK MoD
Reduction in defence budgets, resulting in a need for greater efficiencies Scale of O&S phase expenditure Recognised limitations of existing tools & methods
5
Operating & Support costs
Introductions, Retirements Overhauls, Mods, Emergency repair Operating hours, Fuel, Ordnance, etc Squadron or shipboard maintenance People, Infrastructure, Sustainment Equipment in fleet Depot downtime OpTempo Calculated non-cost Maintenance O&S cost forecasting generally recognised as a difficult area Scale and diversity of factors affecting cost Complexity of behaviour / interrelationships Uncertainties associated with long planning horizons
6
“If you try and take a cat apart to see how it works, the first thing you have on your hands is a non-working cat” - Douglas Adams
7
System Dynamics A Systemic Approach capturing the “whole”
often high level includes “management” Time Evolutionary View not static system behaviour
8
Illustrate the interactions between a large number of variables
Shipyard Level Maintenance Shipyard Actions Outstanding Rate Shipyard Complete Actions Rate Incur Shipyard Actions Downtime Duration of Shipyard Actions Capacity To Undertake Actions System Age Operational Stress Total Systems In Service Shipyard Actions / System / Year Rate Incur Shipyard Actions Shipyard Cost / System / Year Rate Incur Shipyard Actions Cost Cost / Action + - Influence Diagrams Illustrate the interactions between a large number of variables May reveal the likely dynamics of the system under study A precursor to SD simulation models and also to communicate simulation model structure
9
Representing the business
process
13
The suite of OSCAM tools provides:
Business process analysis A time based simulation of equipment operation that allows cost databases to be used for forward projection The ability to assess and understand O&S costs and drivers The ability to explore new strategies for reducing O&S costs A method of prioritising data collection Typical usage Milestone submissions for procurement In-service annual cost submissions Analysis of Alternatives Bespoke Studies
14
Ohio replacement Virginia Class Block III Upgrade LPD LCS DDG-1000 JHSV Unmanned Naval Surface Combatant Coast Guard National Security Cutter & Off-shore Patrol Cutter
15
F-35 Lightning II V-22 Osprey Fire Scout MQ-8B E/A-18G Growler P-8A Poseidon E-2D Advanced Hawkeye
16
Characteristics of a good cost estimate?
17
OSCAM has been described by the US Navy as providing an “order of magnitude change in the ability to undertake operating and support cost analysis. Turn-around times for answering what-if questions for milestone questions has changed from days to hours”
18
decision analysis services
David Garrett BEng MBA FIEAust CPEng NER MAPM MCIPS Managing Director +61 (0) decision analysis services
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.